August 2015
Stream Motion measuring bed.
Страница 1: ...August 2015 Stream Motion measuring bed...
Страница 2: ...150828_BA STREAM motion_DE_V15 1_2015 08 28 doc Page 1 STREAM Motion User Manual DOC Sleep Systems St Gallen...
Страница 3: ...7 00 30 Fax 41 71 727 00 39 Authors M Schadegg S Tribus M Kr utle Version V15 1 2015 08 27 Order No BA_Messbett_DE_V15 1_2015 08 27 doc Subject to changes and errors Previous issues Source Version Dat...
Страница 4: ...l before installation and start up We accept no liability for damages caused by inappropriate handling and or failure to observe the user manual This user manual was originally compiled in German Targ...
Страница 5: ...to the touch panel and printer 12 2 3 Starting up the measuring bed 13 2 3 1 Start screen 13 2 3 2 Starting the initialisation cycle 14 2 3 3 Changing to system mode 17 2 3 4 System mode options menu...
Страница 6: ...eans that death severe injuries or significant damage to property may result if the respective precautionary measures are not taken This means that minor injuries or damage to property may result if t...
Страница 7: ...echnology in accordance with approved safety regulations However their usage may present a danger to the life and or health of the user or third parties or cause damage to machines equipment or other...
Страница 8: ...Personnel working on start up and maintenance must be familiar with the safety concepts of the automation technology Operating personnel must be instructed in the use of the control system and know th...
Страница 9: ...sposed of as hazardous waste without exception Defective parts may only be replaced with parts which come from the same manufacturer as the defective part and which have been declared by said manufact...
Страница 10: ...cal damages or damage caused during transportation Step 2 Check the following points Gently push down on the lower longitudinal profile The profile should not budge Visually inspect the vertical and h...
Страница 11: ...rmly fitted brass casing and plate Check all 11 actuators to see if the lower and the upper cogwheels interlock cleanly and free from backlash Corrections can be made by shifting the axis of the cogwh...
Страница 12: ...net patch cable Power cable control box The serial numbers on the touch panel the printer the control box no picture and the measuring bed no picture must correspond All components have been labelled...
Страница 13: ...l system to the touch panel and printer Connect the elements of the control system as per the following image Plug in the touch panel power adapter Plug the Ethernet cable into the control box and the...
Страница 14: ...present a risk of injury Important the measuring bed s pairs of slats automatically move upwards after the touch panel has been switched on For start up please proceed as follows Plug a mouse into th...
Страница 15: ...the start screen 2 First measurement will appear on the screen Press Continue The pairs of slats will move down and the control system will perform an internal measurement cycle During this procedure...
Страница 16: ...inue The pairs of slats will return to the neutral position step 9 During this procedure you will see Moving to neutral position on the screen 6 Move to calculated values will appear on the screen Pre...
Страница 17: ...surements First measurement will appear on the screen If no measurement is started within 2 minutes the display will return to the start screen By pressing No you will return to the Setting OK page Yo...
Страница 18: ...en use the mouse to navigate to the philrouge logo and then click the left mouse button for 10 seconds This can only be done with a connected mouse and not via the touchscreen The display will return...
Страница 19: ...eters menu allows the motors to be moved individually or collectively in manual mode Here the motor positions can be checked against the final values of the sensors and the sensor values can be initia...
Страница 20: ...h 1 foot section 11 Chosen offset Increase offset Reduce offset Exit offset parameters 2 3 7 Checking the pairs of slats in step 9 neutral position In step 9 5 locking positions should be visible abov...
Страница 21: ...System parameters image on the touchscreen see point 2 3 5 1 Bring all motors to basic position top by selecting UP rotational direction and moving the motors using the Motor position all key Keep th...
Страница 22: ...ements see reminder on screen step 9 The program can be stopped at any time by cutting the power supply However you should wait at least 60 seconds before turning the power supply back on again Depend...
Страница 23: ...on the screen Press Continue The pairs of slats will move down and the control system will perform a further measurement cycle During this procedure Running setup will appear on the screen 5 Return to...
Страница 24: ...ting the pairs of slats from 1 head to 11 foot using the and keys The 12th pair of slats always moves in tandem with pair 11 which is why it is not displayed on the screen Manual control of individual...
Страница 25: ...creen If no measurement is started within 2 minutes the display will return to the start screen By pressing No you will return to the Setting OK page You can return to the First measurement screen at...
Страница 26: ...to see that the Ethernet cable is properly connected Check the cable for damage Is the cable plugged into the correct port Is the power supply connected Plug out power supply before opening the switch...
Страница 27: ...from control system measuring bed Fault After start up the Continue button is missing Troubleshooting Check the connecting cable between the control box and the measuring bed Is the cable plugged in a...
Страница 28: ...ssary 4 4 Fault one pair of slats is not moving Fault Faulty fuse indicated via a red LED on the fuse s disconnect terminal in the control box Troubleshooting Plug out the control box power plug Repla...
Страница 29: ...heck the functions of the measuring bed as per point 2 every 3 6 months Clean the sensors with a soft dry dust free cloth Apply commercially available machinery lubricant to the lifting spindles Visua...
Страница 30: ...elines 6 Mechanical check 9 Measurement procedure 21 Moving the motors 18 Offset parameters 19 Parameters 19 Selection and qualifications of personnel 7 Care 28 Safety instructions 5 Start screen 13 L...