The gate
MUST
be completely supported by the gate hinges and
NOT
allowed to rest on the 6400.
The foundation box
MUST
have a drain pipe installed with the correct slope for proper drainage. Improper drainage of the
foundation box will result in stagnant water that will lead to operator failure eventually.
Installation of 6400
Ball Bearing Hinge
P/N 1200-039 (Heavy-Duty)
2 3/4” Hinge pivot point.
Wall
or
Post
3” around
foundation box.
Driveway
1 1/2” pipe sloped to drain.
Foundation
Box
The depth of the concrete is determined by specific
installation requirements, soil conditions and local
building codes.
Important:
Hinge pivot
points
MUST
align with
foundation box pivot point.
Good Soil Drainage
Concrete
Foundation Box Position and Installation
Foundation Bo
x
Pivot Point
3”
3”
3”
1 1/2” drainage pipe
(Not supplied).
Plumb
Run 3/4” conduit
with sweeps from
foundation box to
where control box
will be mounted.
2 5/8” foundation box
pivot point.
Junction
Box
Sample Hinges
Good Soil Drai
nag
e
Concrete
6”
Driveway
Foundation
Box
Drain pipe can connect to an existing drain pipe or be routed to a good
drainage area. A deep hole filled with “good” gravel is an acceptable
drainage source. Check all local building codes for further information.
Good Soil Drainage
Concrete
Remove all parts from inside of foundation box before mounting into concrete. Operator hardware is metric.
Driveway
Foundation
box
MUST
be
level and flush with
drivew
ay sur
face.
Drainage Area
Drain pipe
Good Gravel