background image

CHAPTER 5 

PROTOCOL AND OPERATIONAL WORK 

5-3 

 

Displays for series DT-203NN, DT-105NN and DT-110NN 

 

5.1.2

 

Download GSD file. 

 

On our website, on the download page you can find the file 

GDSML_DTNN_V2.31.zip

with all the configuration files for the DT-NN family. 

 
Once unzipped, there will be a set of .xml files.   You should consult the display  item 

code (label located in the connectors’ area) to select the right file. From this label; the model 
information, number of lines and characters can be obtained. 

 
Our item codes have the following format: 
  

  Single-sided models: 

<

Model

>

/

<

number of lines

>

S

-<

number of characters

  Double-sided models: 

<

Model>

/

<

number of lines

>

D

-<

number of characters

 

For example, our item code DT-105/1S-6, corresponds to the model 

DT-105

 with 

1 line

 

and 

6 characters. 

  The same GSD is used  for single-sided  (S) or double-sided (D)  models.  

You will select your GSD file according to model, number of lines and number of characters.  

GSDML-V2.25-XXXxxx-XXXXXXX-<

Model

>_<

number of lines

>

L

_<

number of characters

>

C

-XXXXXXXX.xml 

 

For the previous item code example, the GSD to use would be: 

GSDML-V2.25-XXXxxx-XXXXXXX-

DT105_1L_6C

-XXXXXXXX.xml 

 

5.1.3

 

Creating a GSD custom file.  

 

In the case that you need avoid the duplicity of devices with the same Device Name, 

you must use the SW67602 software to change the Profinet parameters, create the new GSD 
and update the Display Firmware. 

 
Find and download the GSD file 

FW_Lartet_DT-NN.zip 

at our website, containing the 

configuration project for the DT-NN display family. 

 
Once unzipped, you will get a set of folders, with the model name, number of lines and 

number of characters. 

 
As described in the previous section, from the item code you can get the model, number 

of lines and characters of the display. 

 
For example, to work with a  DT-105/1S-6 the folder DT105_1L_6C must be selected 

which contains the configuration files. 

 
Once installed the software SW67602,  you will find the folder “Projects”  in the 

installation directory of this program. The folder that we have selected with the configuration   
files, must be moved inside “Projects” folder. 

 
 

Содержание DT-105 Series

Страница 1: ...MT DT_NN_EN_20190405 OPERATIONAL MANUAL FOR PROFINET DISPLAY SERIES DT 203NN DT 105NN AND DT 110NN...

Страница 2: ...the display memory 3 2 3 4 Characteristics of temperature humidity probe Option 3 3 3 5 Wiring of temperature humidity probe Option 3 3 3 6 Reset button 3 3 3 7 IP65 Profinet connectors installation 3...

Страница 3: ...from up to 25m DT 110NN 100mm readable from up to 50m As with other display series the DT NN is available in one or two sided versions which provides multiple solutions and installation possibilities...

Страница 4: ...ly Voltage 100 to 240 VAC 50 60Hz or 24VDC option Consumption See section 2 2 Display 7x5 Dot matrix of 50mm high Red Led colour Visibility 25 meters Parameter memory Eeprom Watch calendar Second Minu...

Страница 5: ...26 14 97 359 DT 110 3D 13 27 5 77 249 DT 105 2S 33 14 65 225 DT 110 3S 20 28 60 205 DT 105 2D 33 16 5 120 447 DT 110 3D 20 39 110 381 DT 105 2S 40 16 77 271 DT 110 3S 26 36 77 271 DT 105 2D 40 19 5 1...

Страница 6: ...3 14 76 276 DT 203 2S 20 6 5 40 DT 105 6D 13 16 5 143 484 DT 203 2D 20 7 65 DT 105 6S 20 17 110 405 DT 203 2S 40 9 5 65 DT 105 6D 20 22 209 705 DT 203 2D 40 11 125 DT 105 7S 6 9 47 160 DT 203 4S 20 8...

Страница 7: ...292 X 968 X O O DT 105 5S D 6 375 542 X 92 358 X 358 X O O DT 105 5S D 13 680 542 X 92 358 X 663 X O O DT 105 5S D 20 985 542 X 92 358 X 968 X O O DT 105 6S D 6 375 648 X 112 424 X 358 X O O DT 105 6...

Страница 8: ...69 O O O DT 110 7S D 6 666 1445 723 80 1286 643 649 O O O DT 110 7S D 13 1276 1445 723 80 1286 643 1259 O O O DT 110 8S D 6 666 1654 830 80 1500 750 649 O O O DT 110 8S D 13 1276 1654 830 80 1500 750...

Страница 9: ...105NN and DT 110NN Measures in millimetres X Not valid for these models P1 P2 and P3 Anchorage point Used O Not used X Anchorage holes position on the wall See valid point P1 P2 o P3 on the table in...

Страница 10: ...DT 203 DT 105 and DT 110 should not be installed in places with illumination level higher than 1000 lux Neither should the display be placed in direct sunlight as visibility would be lost Displays DT...

Страница 11: ...modem cable must be available Fig 3 in order to connect the computer to the display The TDLWin application available on our website allows us to edit the text messages with icons that eases the insert...

Страница 12: ...ption The temperature humidity probe is delivered with 5m cable and a Sub D9 connector ready to use The wiring of connector probe is shown in the diagram cable connector 3 6 Reset button If the displa...

Страница 13: ...anner After we pass the Ethernet cable not supplied through the cable gland and start the IP65 connector mounting Together with the connector there is a manual explaining in detail its installation On...

Страница 14: ...9 mounting is really easy and quick to make for it we will pass the cable through the cable glad and leave enough space for its welding see section 3 3 and or 3 5 depending if it is for the transfer o...

Страница 15: ...must connect it to the display tightening the screws with a screwdriver for let it well secured then with the help of a tool we have to tight the cable gland of the connector to acquire finally the p...

Страница 16: ...y message 0 4 2 Programming parameters Before using the display the configuration parameters must be set as required The parameters configuration is done through a menu that is selected by two buttons...

Страница 17: ...ded with factory default messages If a new list is generated it must contain at least message 0 wich is displayed when the display is powered 4 2 3 3 Parameter Protocol The available protocols are TDL...

Страница 18: ...messages that have more characters than the display If you want to show a message of 25 characters in a 20 character display the message will shift right to left to show all the characters contained i...

Страница 19: ...static message is one whose number of characters is less or equal than the number of characters that can be displayed in a line The dynamic message will have more characters than characters per line h...

Страница 20: ...D file and update the display with the new configuration Let s see cases where the use of this tool may or may not be necessay 1 In the Profinet network there is only a DT NN family display The displa...

Страница 21: ...2 25 XXXxxx XXXXXXX Model _ numberoflines L_ numberofcharacters C XXXXXXXX xml For the previous item code example the GSD to use would be GSDML V2 25 XXXxxx XXXXXXX DT105_1L_6C XXXXXXXX xml 5 1 3 Crea...

Страница 22: ...iguration to open the configuration project It is the configuration DT105_1L_6C in our example Choose the configuration Project and press OK Select the option Set Communication and edit the communicat...

Страница 23: ...ide the folder DT105_1L_6C As last step we must update the display firmware with the new parameters selecting Update Device The factory IP address is 10 30 90 11 We must insert this address in the dat...

Страница 24: ...d by the PLC or with offline equipment which for some reason the IP address has been changed from default value If the equipment IP address is unknown there are some utilities that find automatically...

Страница 25: ...list the content Choose the GSD files for the displays which will be included in the Project and press the button Install Wait until the installation process ends and the devices will be ready to be...

Страница 26: ...assign its IP address 1 in the Profinet network The Device view will be displayed double clicking in a particular display 4 Assign the E S address space In the Device view field check that the Name 1...

Страница 27: ...for return control information in future updates of the product actually no data is returned 5 Compile and update the project in the PLC With all the elements added and configured compile the project...

Страница 28: ...gram specifically designed for the programming of these displays TDLWin program is available at our website for free All the displays have pre programmed default factory messages If you change them pl...

Страница 29: ...e message consists of 4 bytes Being QBx the first output address of PLC which we have configured the display module and QBx 1 QBx 3 the address of the successive bytes B1 B4 Are the data bytes contain...

Страница 30: ...d lines you want to visualize The data block is sent as a s string of characters starting at the first available output address of the PLC that corresponds to the first character on the first display...

Страница 31: ...ayed Text Qu hora es Son las 14 51 03 The characters 0Ch 18h and 0Dh are the special commands for line feed time insertion HH MM SS format and end of data respectively Example 2 In the same display mo...

Страница 32: ...ing 09h End of digits blinking 15h Display date Format DD MM YY 16h Display time Format HH MM 18h Display time Format HH MM SS 1Ch Set date and hour Example Set the date and time to 29 06 18 15 30 Thi...

Страница 33: ...the ARs between controller and network devices The following table describes the meaning of the LEDs 1788K04G LED SIGNIFICADO BF Failure bus ON The Ethernet connection is defective IP address is dupl...

Отзывы: