Trench - 94
RT80Q Operator’s Manual
Operate
Operate
Breathing crystalline silica dust may cause lung disease.
Cutting, drilling, or working materials such as concrete, sand, or rock
containing quartz may result in exposure to silica dust. Use dust control
methods or appropriate breathing protection when exposed to silica dust.
To help avoid injury:
•
Use water spray or other means to control dust.
•
Refer to U.S. Department of Labor Occupational Safety and Health Administration guidelines to
learn more about appropriate breathing protection and permissible exposure limits.
Electric shock will cause death or serious injury. Stay
away.
274-049
To help avoid injury:
Expose lines by hand before digging. Cutting high voltage cable can cause
electrocution.
Misuse of machine can cause death or serious injury.
Read and understand operator’s manual and all other safety instructions
before use.
273-475
To help avoid injury:
•
Comply with all utility notification regulations before digging or drilling.
•
Notify companies that do not subscribe to One-Call.
Flying objects thrown by machine may strike people.
Wear hard hat and safety glasses.
Содержание RT80Q
Страница 1: ...RT80Q Tier 4 Operator s Manual 053 2708 Issue 2 0 ORIGINAL INSTRUCTION...
Страница 7: ...Overview 6 RT80Q Operator s Manual About This Manual...
Страница 67: ...Operation Overview 66 RT80Q Operator s Manual...
Страница 80: ...RT80Q Operator s Manual Transport 79 Transport Chapter Contents Lift 80 Tie Down 83 Haul 86 Tow 89...
Страница 91: ...Transport 90 RT80Q Operator s Manual...
Страница 92: ...RT80Q Operator s Manual Trench 91 Trench Chapter Contents Set Up 92 Operate 94...
Страница 98: ...RT80Q Operator s Manual Plow 97 Plow Chapter Contents Set Up 98 Operate 101...
Страница 105: ...Plow 104 RT80Q Operator s Manual...
Страница 106: ...RT80Q Operator s Manual Reel Carrier 105 Reel Carrier Chapter Contents Set Up 106 Operate 107...
Страница 109: ...Reel Carrier 108 RT80Q Operator s Manual...
Страница 110: ...RT80Q Operator s Manual Saw 109 Saw Chapter Contents Setup 110 Before First Use 110 Operation 112 Normal Use 112...
Страница 114: ...RT80Q Operator s Manual Backhoe 113 Backhoe Chapter Contents Set Up 114 Operate 115 Stow 116...
Страница 137: ...Systems and Equipment 136 RT80Q Operator s Manual Counterweighting...
Страница 183: ...Service 182 RT80Q Operator s Manual As Needed...
Страница 201: ...Specifications 200 RT80Q Operator s Manual RC80 Reel Carrier...
Страница 204: ......
Страница 205: ......
Страница 206: ...RT80Q Operator s Manual Service Record 205 Service Record Service Performed Date Hours...
Страница 207: ...Service Record 206 RT80Q Operator s Manual Service Performed Date Hours...