Systems and Equipment - 164
JT100/JT100 All Terrain Operator’s Manual
Downhole Tools
Installation
Remove all paint from mating surfaces before attaching any bit to housing.
Beacon Housings
Beacon Installation
To ensure beacon is installed correctly in housing, see beacon information.
Soil
Description
sandy soil
sugar sand, blow sand, or other soils where sand is the predominant component
soft soil
sandy loam
medium soil
loams, loamy clays
hard soil
packed clays, gumbo, all compacted soils
rocky soil
chunk rock, glacial till, cobble, rip rap, gravel
soft rock
soft limestone, sandstone, shale, coral, caliche
hard rock
granite, schist, marble, hard limestone
Содержание JT100
Страница 1: ...JT100 JT100 All Terrain Tier 4 Issue 2 1 Original Instruction Operator s Manual 053 2814...
Страница 23: ...Safety 22 JT100 JT100 All Terrrain Operator s Manual Machine Safety Alerts Machine Safety Alerts...
Страница 105: ...Prepare 104 JT100 JT100 All Terrain Operator s Manual...
Страница 193: ...Service 192 JT100 JT100 All Terrain Operator s Manual Service and Lubrication Overview Service and Lubrication Overview...
Страница 247: ...Service 246 JT100 JT100 All Terrain Operator s Manual As Needed...
Страница 254: ...JT100 JT100 All Terrain Operator s Manual Service Record 253 Service Record Service Performed Date Hours...
Страница 255: ...Service Record 254 JT100 JT100 All Terrain Operator s Manual Service Performed Date Hours...
Страница 258: ......
Страница 259: ......
Страница 260: ...JT100 JT100 All Terrain Operator s Manual Appendix 259 Appendix Chapter Contents Engine Diagnostic Codes...