BACnet MS/TP Communication Data Bus Fundamentals
Network Guide
27
Figure 14: Typical Cable-Shield Grounding Requirements for a BACnet MS/TP Data Bus Segment with a Building
Controller located in the Middle of the Data Bus
Figure 15: Typical Cable-Shield Grounding Requirements for a BACnet MS/TP Data Bus Segment without
Building Controller
Typical BACnet 24VAC-
Powered Controller
Data Bus Shields: Twist
together and Isolate
with electrical tape
Typical BACnet 24VAC-
Powered Controller
Data Bus: Shielded Twisted Pair Cable
NE
T+
NE
T
-
NE
T+
NE
T
-
Typical BACnet 24VAC-
Powered Controller
NE
T+
NE
T
-
Data Bus Shield:
Isolate with
electrical tape
Typical BACnet Line-
Powered Controller
Data Bus Shields: Twist
Together and Connect
to ‘COM’ Terminal
NE
T-
NE
T+
CO
M
Typical BACnet Line-
Powered Controller
Data Bus Shields:
Connect to ‘COM’
Terminal
NE
T-
NE
T+
CO
M
Electrical
System
Ground
The shield of the data bus must be connected to
the electrical system ground at one point only ,
ideally in the middle of the data bus as shown
Содержание ECB-VAV
Страница 1: ...User Guide Network Guide...
Страница 6: ...Table of Contents 4 Network Guide...
Страница 52: ...50 Network Guide...
Страница 70: ...68 Network Guide...
Страница 110: ...108 Network Guide...
Страница 121: ...LonWorks Troubleshooting Network Guide 119...
Страница 122: ...120 Network Guide...
Страница 124: ...122 Network Guide...
Страница 128: ...126 Network Guide...
Страница 134: ...132 Network Guide Figure 75 Example of How to Set a DIP Switch to 82 ON B A For example 82 A 1010 B 010...
Страница 136: ...134 Network Guide...
Страница 137: ...Network Guide...
Страница 138: ...Network Guide_UG_24_EN...