
**
1. One or more upper/lower tubing may have holes on both sides.
2. Make sure each tubing has at least one pair of 2 holes facing outward (see detail 2).
3. Arrange tubings with one pair holes (see detail 3a), then sort tubings with two pairs holes
(see detail 3b) to open places.
Open small box, lay out 4 long
Tubings (C1, C2, D1, D2)
on a flat surface. See picture below to
identify where each tubing goes to (upper or lower, left or right).
LEFT VIE
W
BA
CK VIE
W
Lower Left Tubing
LEFT VIE
W
BA
CK VIE
W
Upper Left Tubing
Lower Right Tubing
BA
CK VIE
W
RIGHT VIE
W
Upper Right Tubing
BA
CK VIE
W
RIGHT VIE
W
D1
D2
C2
C1
2
2
3a
3b
A
A.
Instructions
1
B.
Metal
Base
1
C1.
Lower Round Tubing (Left) 1
C2.
Lower Round Tubing (Right) 1
D1.
Upper Round Tubing (Left) 1
D2.
Upper Round Tubing (Right) 1
E.
Tubing Connector
2
F.
Pan Head Screw
12
CAUTION:
METAL BASE IS HEAVY! 2 PERSONS LIFT/MOVE
TO PREVENT ANY PHYSICAL INJURY.
*Hex Key
for
Part F
can be found inside the
TV Bracket
box.
(DUOPOLEBK)
B
C1
C2
F
E
D1
D2
PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE START THE ASSEMBLING.
FLAT BASE TV STAND
Parts
55 Broadcommon Road Bristol, RI 02809, USA Phone: 1-800-572-2194 1-401-247-0333 (Int'l) Fax: 1-401-247-0392
1
1