Page 87
AIM 2 Operation Manual
Performing an In-Line Test
You can use the AIM’s In-Line test feature to help determine the cause of a problem in an
installation. Connecting the AIM in series with the equipment, you can progressively test each
segment of the connection between the ODU and the IRD to locate a problem. The AIM can
measure the voltage, current, and 22 kHz signals to verify that the correct control signals are
being transmitted through the coaxial cable.
1.
Set up the job for the installation. See the
Starting a Job
section in
Chapter 5
.
2. From the
HOME
screen, press
TEST
to go to
the TEST screen.
3.
Highlight In-Line Test and press SELECT to go
to the IN-LINE CONFIGURATION screen.
4.
Highlight the equipment configuration for the
installation and press SELECT to go to the IN-
LINE LOCATION screen.
Содержание Advanced Installation Meter 2
Страница 6: ...Page 6 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 12: ...Page 12 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 14: ...Page 14 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 44: ...Page 44 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 50: ...Page 50 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 60: ...Page 60 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 66: ...Page 66 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 92: ...Page 92 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 104: ...Page 104 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 108: ...Made in U S A ...