ASE 150 Operator’s Manual
76
Doc. 065207-02 9/08
5. Disconnect the gray cable from the pump PC board (
).
6. Use a 3-mm hex screwdriver (P/N 060154) to remove the screws in
the left and right end plates (
) on the pump. These screws secure
the pump to the component panel.
5.5.3
Removing the Check Valves and Cartridges
1. Use a 1/2-inch open-end wrench to loosen the
inlet
check valve
housing. Remove the housing and then remove the check valve
cartridge from the housing (see
2. Turn the pump over, so that the outlet check valve is facing down.
3. Use a 1/2-inch open-end wrench to loosen the
outlet
check valve
housing. Remove the housing and then remove the check valve
cartridge from the housing.
NOTE The
housing for the
inlet
check
valve assembly has a 1/4-28
port. The housing for the
outlet
check valve assembly has a 10-
32 port (see
Figure 5-9. Check Valve Housings
Figure 5-8. Disassembled ASE 150 Pump Inlet Check Valve
44
55
Inlet Check
Valve Housing
Inlet Check
Valve Cartridge
Inlet Check Valve:
1/4-28 Port
Outlet Check Valve:
10-32 Port
Содержание ASE 150
Страница 1: ...ASE 150 Accelerated Solvent Extractor Operator s Manual Document No 065207 Revision 02 September 2008...
Страница 32: ...ASE 150 Operator s Manual 24 Doc 065207 02 9 08...
Страница 64: ...ASE 150 Operator s Manual 56 Doc 065207 02 9 08...
Страница 76: ...ASE 150 Operator s Manual 68 Doc 065207 02 9 08...
Страница 114: ...ASE 150 Operator s Manual 106 Doc 065207 02 9 08...
Страница 132: ...ASE 150 Operator s Manual 124 Doc 065207 02 9 08...