5 • Service
Doc. 065051-03 1/08
135
5. Insert the syringe drive connecting screw removed in
and tighten fingertight.
6. Perform a flush cycle:
a. Press
Menu
,
Menu
, and
6
to go to the
FLUSH/PRIME
screen.
b. Move the cursor to the
ACTION
field and press
Select
Δ
or
Select
∇
to select
FLUSH
. Press
Enter
.
7. Check the syringe for bubbles. If any exist, remove the syringe and
remove the bubbles (see
). Reconnect the syringe and
flush again.
5.3.4
Initializing the Syringe
1. On the
MENU of SCREENS
, press
5
and
3
to go to the
PLUMBING
CONFIGURATION
screen.
Figure 5-5. Flush/Prime Screen
Figure 5-6. Plumbing Configuration Screen
Help Prompt
FLUSH/PRIME
VOLUME:
RESERVOIR:
ACTION:
uL
250
FLUSH
FLUSH
SYRINGE:
PRIME
READY
VOLUME:
uL
2000
RESERVOIR: RES A
SYRINGE:
RES A
PREP
ACTION: READY
SAMPLE
Help Prompt
PLUMBING CONFIGURATION
LOOP SIZE V1:
SAMPLE SYRINGE VOLUME:
PREP SYRINGE VOLUME:
SAMPLE SYRINGE CONFIG:
5
25
250
READY
uL
uL
mL
PREP SYRINGE CONFIG:
READY
uL
LOOP SIZE V2:
Содержание As
Страница 1: ...AS Autosampler Operator s Manual Document No 065051 Revision 03 January 2008...
Страница 190: ...AS Autosampler Operator s Manual 178 Doc 065051 03 1 08...
Страница 238: ...AS Autosampler Operator s Manual 226 Doc 065051 03 1 08...
Страница 338: ...AS Autosampler Operator s Manual 326 Doc 065051 03 1 08...
Страница 355: ...Index Doc 065051 03 1 08 Index 17 Z Z address 255...
Страница 356: ...AS Autosampler Operator s Manual Index 18 Doc 065051 03 1 08...