39
5.1.2. Positioning the lift
1. make sure that the ground is even and hard enough to support the lift in a steady, level
position
Soil material
Density
Max. ground
pressure
P kg/cm² (N/cm²)
Gravel
High density
6 (59)
Medium density
4 (39)
Loose
2 (20)
Sand
High density
5 (49)
Medium density
3 (29)
Loose
1.5 (15)
Fine sand
High density
4 (39)
Medium density
2 (20)
Loose
1 (10)
Sand/ mud
High density (very hard to work)
1.00 (10)
Medium density (hard to work)
0.50 (5)
Loose (easily worked)
0.25 (3)
2. Check that the standing surface is free from potholes, pits or too inclined areas.
3. Check that the movement area of the outriggers and the boom, as well as the area under
the outriggers, are free from obstacles, which could cause collision or turn the machine
over.
DANGER
WARNING
CAUTION
NOTICE
Tip over hazard!
If the ground is soft, use sufficiently large and sturdy additional plates
under the support outriggers.
4. Drive or push the lift to the inspected lifting site
5. Engage the parking brake
6. Disconnect the lift from the towing vehicle
P
DINO
Содержание DINO XT II 160
Страница 2: ......
Страница 6: ...6 Ekspluat cijas instrukcijas DINO 160XT II 180XT II 210XT II BLANK...
Страница 10: ...10 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 DIMENSION DRAWINGS 2 1 1 160 XTB II...
Страница 11: ...11 2 1 2 180 XTB II...
Страница 12: ...12 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 3 210 XTB II...
Страница 29: ...29 BLANK...
Страница 37: ...37 NOTES...
Страница 58: ...58 Operating instructions DINO 160XTB II 180XTB II 210XTB II NOTES...
Страница 59: ...59 NOTES...
Страница 63: ...63 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13 14...
Страница 69: ...69 BLANK...
Страница 70: ...70 Operating instructions DINO 130T II BLANK...
Страница 72: ...72 Operating instructions DINO 130T II NOTES...
Страница 73: ...73 NOTES...