Digitrax UP7 Скачать руководство пользователя страница 1

© 2022 Digitrax, Inc.

www.digitrax.com

— 1 —

Features:

 

Simplifies hookup, maintenance and troubleshooting of LocoNet.

 

All connections plug-detachable.

 

Two RJ12 Throttle Jacks in front panel.

 

One RJ12 LocoNet Jack on side of panel.

 

Track Status Indicator LED option shows local track status if hooked up to a  

track section.

 

Two RJ12 LocoNet Jacks in rear for connection to other LocoNet devices. 

Use with 6 conductor telephone cable with RJ12 6-pin connectors and daisy 

chain your LocoNet ports around the layout.

 

“Power sharing” charge Circuitry for throttles connected to six UP7's. (Ex-

ternal 12V supply required for this optional DT602/UT6 charging source in 

sleep mode). 

Parts List

1 UP7 Front Panel 

 

 

            1 UP7 PCB with 4pin plug

1 Instruction Sheet 

Panel Assembly

The UP7 is shipped with the front 

panel unattached. Attach the panel 

as oriented in Figure 1 prior to 

installing the UP7 in your layout: 

Unscrew the two #2 screws on the 

faceplate rear tabs, insert the UP7 

PCB.  Screw back these two screws, 

which then clamp the PCB horizon-

tally at the back of the panel.

 

UP7 Panel Installation

1. 

Inspect all the RJ12 Jacks have 

6 parallel gold pins, with none 

shorted to adjacent pins.

2. 

The UP7 Universal Panel is 

designed for mounting on the 

fascia board of the layout. Cut a hole approximately 2.6” w x 1.7” h in the 

fascia board. 

3. 

Insert the UP7 through the hole with the face plate on the front of the fascia 

board. Retain the UP7 face plate to the fascia with four e.g. #6 screws of your 

choice.

4. 

Hook up working LocoNet cables at the rear Jacks, and test operation is 

satisfactory with e.g. a Throttle plugged into the front RJ12 Jacks.

 

UP7

     LocoNet Universal Panel

Complete Train Control

 

Run Your Trains, Not Your Track!

Figure 1

TKB

GND

TKA

U

+

Отзывы: