5. 

HANDLING AND INSTALLATION

 

5.1. 

Lifting and transporting the packaged machine 

 IMPORTANT 

During all lifting operations, make sure the packaged machine is firmly anchored to 

avoid it tipping up or being accidentally dropped. 

Always load/unload lorries in adequately lit areas. 

The  machine,  packaged  on  a  wooden  pallet  by the Manufacturer, must be loaded using 
suitable  equipment  (see  EC  Directive  2006/42  and  subsequent  amendments  and/or 
additions) onto the transporting vehicle. At destination, it must be unloaded using similar 
means.  
The squeegees are packed in cardboard boxes without pallet.  
A  fork  lift  truck  must  always  be  used  to  lift  the  packaged  body  of  the  machine.    Handle 
with care to avoid knocking or overturning the machine.  

5.2. 

Checks on delivery 

When  the  carrier  delivers  the  machine, make sure the packaging and machine are both 
whole and undamaged.  If the machine is damaged, make sure the carrier is aware of the 
damage  and  before  accepting  the  goods,  reserve  the  right  (in  writing)  to  request 
compensation for the damage.  

5.3. 

Unpacking 

 IMPORTANT 

When unpacking the machine, the operator must be provided with the necessary 

personal protection devices (gloves, goggles, etc) to limit the risk of accident.  

Unpack the machine as follows: 

•  cut and remove the plastic straps using scissors or nippers; 
•  remove the cardboard;  
•  remove the bags in the battery compartment and check the contents:  

- use and maintenance manual, declaration of conformity, guarantee certificate;  

- battery bridges with terminals 
- connector for battery charger; 

•  depending on the model, remove the metal brackets or cut the plastic straps fixing the 

machine chassis to the pallet; 

•  using a sloping ramp, push the machine backwards off the pallet; 
•  unpack the brushes and squeegee; 
•  clean the outside of the machine in respect of safety regulations; 
•  once the machine is clear of the packaging, the batteries can be installed (see relevant 

paragraph).  

 

 

The  packaging may be kept as it can be reused to protect the machine if it is moved to 
another site or to a repair workshop.  
Otherwise it must be disposed off in compliance with current legislation.  
 

5.4. 

Batteries  

Two different types of battery may be installed on these machines: 

  tubular  leak-proof  batteries:  the electrolyte level must be checked regularly.  When 

necessary, top up with distilled water until the plates are covered. Do not overfill (5 mm 
max. above the plates). 

  gel batteries: this type of battery requires no maintenance. 

Содержание 3.126.160

Страница 1: ...ENGLISH Translation of original instructions...

Страница 2: ...HE OPERATOR 12 6 1 CONTROLS DESCRIPTION 12 6 2 MOUNTING AND ADJUSTING THE SQUEEGEE 14 6 3 MOVING THE MACHINE WHEN NOT IN OPERATION 14 6 4 MOUNTING AND CHANGING THE BRUSH DRIVE DISKS 14 6 5 DETERGENTS...

Страница 3: ...ENGLISH 3 9 3 ROUTINE MAINTENANCE 22 9 3 1 Daily operations 22 9 3 2 Weekly operations 22 9 3 3 Six monthly operations 22 10 CONFIGURING THE SCRUBBER DRIER 23 11 TROUBLESHOOTING 24...

Страница 4: ...hted in bold and preceded by the symbols illustrated and described here DANGER Indicates the need for attention in order to avoid a series of consequences which could cause death or damage to the heal...

Страница 5: ...tion system incorporated in the machine dries the floor after washing by means of the low pressure generated in the dirty water tank by the suction motor The squeegee connected to the tank collects th...

Страница 6: ...ergent tank 4 SAFETY INFORMATION 4 1 Safety regulations Read the User Manual carefully before start up and use or before performing maintenance or any other work on the machine IMPORTANT Rigorously re...

Страница 7: ...operator must always use personal protection devices protective apron or overalls non slip waterproof shoes rubber gloves protective goggles and ear protectors and mask to protect the respiratory trac...

Страница 8: ...from other kits This machine has been designed and constructed to provide ten years service from the fabrication date shown on the rating plate After this time whether the machine has been used or no...

Страница 9: ...with the necessary personal protection devices gloves goggles etc to limit the risk of accident Unpack the machine as follows cut and remove the plastic straps using scissors or nippers remove the ca...

Страница 10: ...cident Keep away from naked flames avoid short circuiting the battery poles avoid sparks and do not smoke The batteries are normally supplied filled with acid and ready for use If the batteries are dr...

Страница 11: ...bles as shown in the diagram tighten the terminals on the poles and cover with Vaseline Lower the tank assembly into the working position DANGER The tank assembly CT 230 MUST ALWAYS BE lowered using t...

Страница 12: ...machine IMPORTANT All phases must be performed in an adequately lit room and adopting the safety measures most appropriate to the situation The operator must always use personal protection devices To...

Страница 13: ...crolls through the various parameters which can be set on the machine software Work programme buttons AUTOMATIC OPERATION set the work programme to be used 1 P1 fig B ref 1 light wash programme for sm...

Страница 14: ...e the accelerator pedal fig D ref 2 IMPORTANT Do not leave the machine unattended or parked with the key inserted in the main switch and the parking brake off 6 4 Mounting and changing the brush drive...

Страница 15: ...s on use of detergents given in the section Safety regulations 6 6 Preparing the machine for work IMPORTANT Before starting work wear overalls ear protectors non slip waterproof shoes mask to protect...

Страница 16: ...ne without deselecting the set programme Auto Power On After setting up the machine proceed as follows start the machine by turning the key main switch clockwise fig B ref 3 Select the most suitable p...

Страница 17: ...ris bin ROLLER head version fig S ref 5 6 8 Some useful tips to get the most from your scrubber drier In the event of particularly stubborn dirt on the floor washing and drying can be performed in two...

Страница 18: ...e unscrew and remove the cap lower the end of the hose gradually controlling the intensity of the flow of water by adjusting the height from the ground when the detergent tank is empty close the drain...

Страница 19: ...ther operations not explicitly described in this manual must be performed by specialised personnel only in compliance with current safety legislation and as described in the maintenance manual DANGER...

Страница 20: ...solution used on the machine replace the filter making sure it is correctly positioned in its housing close the dirty water tank lid fig I ref 1 9 2 3 CT 160 suction motor air filter cleaning rotate t...

Страница 21: ...place with a new blade fitting it onto the screws on the body of the squeegee replace the two blade retainers fig O ref 3 and screw up the nuts fig O ref 2 Replace the squeegee in its support followin...

Страница 22: ...move encrusted dirt charge the batteries according to the procedure described empty and clean the debris bin ROLLER head version fig S ref 5 9 3 2 Weekly operations clean the dirty water tank float sw...

Страница 23: ...wing values can be set OFF when the programme is run water delivery is not active Lev 1 pump active at 18 of working cycle Lev 2 pump active at 36 of working cycle Lev 3 pump active at 45 of working c...

Страница 24: ...faulty have the motor replaced The machine does not clean evenly the brush or disks are worn replace No detergent is delivered the detergent tank is empty fill it the hose delivering the detergent to...

Страница 25: ...olyte level is low top up all the elements with distilled water as described in the instructions the battery charger does not work or is unsuitable see battery charger instructions there are considera...

Страница 26: ...nd charge The brushes are worn Replace the brushes BRUSHES EXHAUSTED The floor is very smooth and the brush motor does not reach the required absorption Change the work programme from P3 to P2 or P1 T...

Страница 27: ...ion The indication of severity remains active for 10 seconds after which the status LED flashes constantly showing a two digit malfunction code until the repairs have been carried out For example erro...

Отзывы: