PUTTING THE RAMP INTO SERVICE
9.1
QUALITY CONTROL AND PDI TEST
Finish the ramp in accordance with local regulations.
Ensure that all mounting bolts are fastened with the required torque. See appendix 11.2 on page 42.
Execute all movements min. 5 times to ensure all ramp functions work properly. Pay special attention to:
1.
When deploying: the platform main section and foldable point fold open smoothly and can be handled with reasonable
human effort.
2.
When deploying: (if so equipped) the support feet and the outboard platform edge are resting on the ground.
3.
When stowing: the platform main section and foldable point fold shut smoothly and can be handled with reasonable human
effort.
4.
When stowing: the automatic lock engages automatically.
Refer to section 9.3 on page 35 in case any adjustments must be made.
Make sure that the ramp will be clearly visible in surrounding traffic:
Place cones around the platform to alert surrounding traffic.
Apply the safety decals to the ramp and the vehicle body before delivery to the customer, see section 10 on page 38.
Work through the CHECKLIST FOR THE PRE-DELIVERY INSPECTION (PDI) TEST in appendix 11.3 on page 43 and complete
the practical load tests indicated.
Refer to the CE IDENTIFICATION AND INSPECTION LOGBOOK and fill-out the FITTING DECLARATION therein.
NOTICE
WARNING
The PDI checklist completes the final quality inspection of the installation. Once completed successfully, it will certify the safe
and reliable operation of the ramp.
Operating a ramp that hasn’t successfully passed the PDI can lead to premature wear or damage of the ramp itself.
Operating a ramp that hasn’t successfully passed the PDI can put the operator and third parties at great risk, and could result
in severe personal injury or death.
WARNING
Improper use of the ramp can put the operator at great risk of serious bodily injury and death. If in doubt how to use the ramp
correctly, ALWAYS consult the operation manual prior to continuing.
NEVER exceed the maximum rated capacity of the ramp.
Содержание DH-AI02.04.01
Страница 10: ...9 DHOLLANDIA DH AI12 04 01 TERMINOLOGY DH AI13 04 01 TERMINOLOGY...
Страница 11: ...10 DHOLLANDIA DH AI12 10 01 TERMINOLOGY Portable ramp DH AI02 04 01 TERMINOLOGY...
Страница 15: ...14 DHOLLANDIA 7 4 TECHNICAL SPECIFICATIONS DH AI12 04 01...
Страница 16: ...15 DHOLLANDIA DH AI12 10 01...
Страница 17: ...16 DHOLLANDIA DH AI13 04 01...
Страница 18: ...17 DHOLLANDIA DH AI02 04 01...