30
DHOLLANDIA
When 2 mobile column lifts are used and the configuration selector is switched to 4, all 4 lift forks will go up and down
simultaneously when you press LIFT or LOWER on the control box . If both mobile columns lifts were not set at equal height
initially, this will result in the vehicle standing askew in longitudinal direction.
To level 2 mobile column lifts, proceed as follows:
Turn the configurator selector on the 2 master columns
counter clockwise to enable individual operation of each
separate system.
Press LIFT / LOWER on the targeted mobile column lift to
raise or lower the correspding lift forks, and level the 4 lift
forks of the 2 mobile column lifts.
Turn the configuration selector on the 2 master columns
clockwise, back to 4 to enable synchronised operation of all
lift columns together.
Press LIFT / LOWER to check if all lift forks go up and down
in a synchronised way.
If levelling process is not successful, DO NOT use the mobile
column lift, put it out of operation and contact an authorized
DHOLLANDIA service agent for repair.
9.9
SWITCHING OFF THE MOBILE COLUMN LIFT
Never leave the mobile column lift unattended while a vehicle is still lifted off the ground. If works are not finished at the close of
business, lower the vehicle to the ground. Do NOT leave it up in the air overnight.
After use or when leaving the mobile column lift unattended:
Switch OFF the main power switch [1] on the electric control box. See section 9.7 on page 27. The indicator light [2] should
turn dark.
Disconnect the main power plug from the electricity network. ALWAYS pull by the plug, not by the cable.