![DGSHAPE DWX-53DC Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/dgshape/dwx-53dc/dwx-53dc_installers-manual_2491764052.webp)
Before starting
work
50
Insta
llatio
n
Perform spindle habituation operations
Run-in operation is performed to stabilize the rotation of the spindle by spreading grease over the sliding parts inside the
spindle.
Procedure
1.
Close all covers.
2.
Displays VPanel.
3.
Click OK.
The [DWX-53DC Aircraft Sets] window appears.
4.
Click [Spindle Run-in] in the [Maintenance] tab.
5.
When the following figure is displayed, click [OK].
Start running-in.
Содержание DWX-53DC
Страница 3: ......
Страница 22: ...Install the aircraft 20 Insta llatio n Relevant informatio n P 41 Connecting Multiple Units ...
Страница 59: ...Before starting work 57 Insta llatio n ...
Страница 60: ...Before starting work 58 Insta llatio n Turn off Procedure 1 Turn off the aircraft s power switch ...
Страница 65: ...Spe cific atio ns 63 App endi x Side face A 912 mm B 560 mm C 97 mm D 334 mm E 763 mm F 1 097 mm ...
Страница 66: ...Spe cific atio ns 64 App endi x Adaptor dimensions for pin materials 62 mm 22 mm 72 mm ...
Страница 67: ...Spe cific atio ns 65 App endi x Detection pin dimensions 33 mm 60 mm Φ4 mm ...
Страница 70: ...Spe cific atio ns 68 App endi x ...