- 18 -
Ensure that the inverter meets the following condi�ons before star�ng the inverter, otherwise
it may cause fire or damage to the inverter without quality assurance, at the same �me the
situa�on on our company does not undertake any responsibility. At the same �me, to op�mize
the system configura�on, it is recommended that the two inputs be connected to the same
number of PV modules.
a). The maximum open voltage of each set of PV modules shall not exceed 1000Vdc under any
condi�ons.
b). Each input of the inverter be�er use the same type of PV module in series.
c). Total output power of pv shall not exceed the maximum input power of inverter, each PV
modules shall not exceed the rated power of each channel.
6. Start up and Shut off
When start up the inverter, should fellow below steps
:
1. First switch on the AC breaker.
2. Turn on the DC switch of the PV module, and if the panel provides sufficient star�ng voltage
and power, the inverter will start.
3. When the AC voltage and DC voltage are normal, the inverter start-up is ready to begin. The
inverter will first check the internal parameters and the grid parameters, while the liquid
crystal will show that the inverter is self-checking.
4. If the parameter is within acceptable range, the inverter will generate energy.
NORMAL indicator light is on.
6.1 Start up the inverter
Must follow below steps while Shu�ng down the inverter:
1. Switch off the AC breaker.
2. Wait for 30 seconds, turn off the dc switch (if any), or simply disconnect the dc input
connector. The inverter will close the LCD and all led within two minutes.
6.2 Shut off the inverter
For the configura�on of datalogger, please refer to illustra�ons of the datalogger.
5.4.2 Configura�on of datalogger