Time of use:

 

it is used to program when to use grid or 

generator to charge the ba�ery, and when to discharge 

the ba�ery to power the load. Only �ck "Time Of Use" 

then the follow items (Grid, charge, �me, power etc.) 

will take effect.

Note: 

when in selling first mode and click �me of use, 

the ba�ery power can be sold into grid.

Grid charge: 

u�lize grid to charge the ba�ery in a �me 

period.

Gen charge: 

u�lize diesel generator to charge the ba�ery 

in a �me period.

Time:

 real �me, range of 01:00-24:00.

Power:

 Max. discharge power of ba�ery allowed.

Ba�(V or SOC %): 

ba�ery SOC % or voltage at when the 

ac�on is to happen.

Time Of Use

Time

System Work Mode

Batt

Grid

Charge Gen

01:00
05:00
09:00
13:00
17:00
21:00

5:00
9:00

13:00
17:00
21:00
01:00

Power

8000
8000
8000
8000
8000
8000

49.0V
50.2V
50.9V
51.4V
47.1V
49.0V

Work

Mode2

During 01:00-05:00, when ba�ery SOC is lower than 80%, it will 

use grid to charge the ba�ery un�l ba�ery SOC reaches 80%. 
During 05:00-08:00 and 08:00-10:00, when ba�ery SOC is higher 

than 40%, hybrid inverter will discharge the ba�ery un�l the SOC 

reaches 40%. 
During 10:00-15:00, when ba�ery SOC is higher than 80%, hybrid 

inverter will discharge the ba�ery un�l the SOC reaches 80%.
During 15:00-18:00, when ba�ery SOC is higher than 40%, hybrid 

inverter will discharge the ba�ery un�l the SOC reaches 40%.
During 18:00-01:00, when ba�ery SOC is higher than 35%, hybrid 

inverter will discharge the ba�ery un�l the SOC reaches 35%.

Time Of Use

Time

System Work Mode

Batt

Grid

Charge Gen

01:00
05:00
08:00
10:00
15:00
18:00

5:00
8:00

10:00
15:00
18:00
01:00

Power

8000
8000
8000
8000
8000
8000

80%
40%
40%
80%
40%
35%

Work

Mode2

For example:

Solar Sell:

 

“Solar sell” is for Zero export to load or Zero export to CT: when this item is ac�ve, the surplus 

energy can be sold back to grid. When it is ac�ve, PV Power source priority usage is as follows: load 

consump�on and charge ba�ery and feed into grid.

Max. sell power:

 

Allowed the maximum output power to flow to grid

.

Zero-export Power: 

for zero-export mode, it tells the grid output power. Recommend to set it as 20-100W 

to ensure the hybrid inverter won' t feed power to grid.

Energy Pa�ern:

 

PV Power source priority.

Ba� First:

 

PV power is firstly used to charge the ba�ery and then used to power the load. If PV power is 

insufficient, grid will make supplement for ba�ery and load simultaneously.

Load First:

 

PV power is firstly used to power the load and then used to charge the ba�ery. If PV power is 

insufficient, grid will make supplement for ba�ery and load simultaneously.

Max Solar Power:

 

allowed the maximum DC input power

.

Grid Peak-shaving: 

when it is ac�ve, grid output power will be limited within the set value. If the load 

power exceeds the allowed value, it will take PV energy and ba�ery as supplement. If s�ll can’t meet the 

load requirement, grid power will increase to meet the load needs.

Содержание SUN 5K-SG01LP1-US

Страница 1: ...Hybrid Inverter User Manual R ...

Страница 2: ...ist 3 2 Mounting instructions 3 3 Battery connection 3 5 PV Connection 3 4 AC Input Output Connection 4 OPERATION 4 1 Power ON OFF 4 2 Operation and Display Panel 5 LCD Display Icons 5 1 Main Screen 5 2 Solar Power Curve 01 01 04 04 21 22 23 33 3 6 CT Connection 3 7 Earth Connection mandatory 3 8 WIFI Connection 3 9 Wiring System for Inverter Contents 5 4 System Setup Menu 5 5 Basic Setup Menu 5 3...

Страница 3: ...ctly operate this inverter Be very cau ous when working with metal tools on or around ba eries Dropping a tool may cause a spark or short circuit in ba eries or other electrical parts even cause an explosion Please strictly follow installa on procedure when you want to disconnect AC or DC terminals Please refer to Installa on sec on of this manual for the details Grounding instruc ons this inverte...

Страница 4: ...n Bu ons 4 DC Switch 5 Power on off bu on 6 RS 485 Port 7 CAN Port 8 Ba ery input connectors 9 Func on Port 10 Parallel Box master 11 Parallel port 12 PV input with two MPPT 13 Grid 14 Generator input 15 Load 16 WiFi Interface 1 02 2 3 4 5 8 9 10 11 12 13 14 15 16 7 6 ...

Страница 5: ...or power Overload over temperature short circuit protec on Smart ba ery charger design for op mized ba ery performance With limit func on prevent excess power overflow to the grid Suppor ng WIFI monitoring and build in 2 strings of MPP trackers Smart se able three stages MPPT charging for op mized ba ery performance Time of use func on Smart Load Func on 2 3 Basic System Architecture The following ...

Страница 6: ... on Please make sure nothing is damaged in the package You should have received the items in the following package Hybrid inverter x1 L type Hexagon wrench x1 Stainless steel an collision bolt M8 80 x4 Ba ery sensor x1 User manual User manual x1 Wi Fi Plug op onal x1 Sensor Clamp op onal US x2 EU x1 ...

Страница 7: ... the television Antenna or antenna cable Not higher than al tude of about 2000 meters above sea level Not in environment of precipita on or humidity 95 Considering the following points before selec ng where to install Please select a ver cal wall with load bearing capacity for installa on suitable for installa on on concrete or other non flammable surfaces installa on is shown below Install this in...

Страница 8: ...is inverter is heavy Please be careful when li ing out from the package Choose the recommend drill head as shown in below pic to drill 4 holes on the wall 52 60mm deep 1 Use a proper hammer to fit the expansion bolt into the holes 2 Carry the inverter and holding it make sure the hanger aim at the expansion bolt fix the inverter on the wall 3 Fasten the screw head of the expansion bolt to finish the ...

Страница 9: ...nt protector or disconnect device is required between the ba ery and the inverter In some applica ons switching devices may not be required but over current protectors are s ll required Refer to the typical amperage in the table below for the required fuse or circuit breaker size Model 5 6 7 6 8Kw Wire Size 2AWG Cable mm 2 35 Torque value max 24 5Nm ...

Страница 10: ... inverter is correctly connected Connec ng the ba ery with a suitable cable is important for safe and efficient opera on of the system To reduce the risk of injury refer to Chart 3 2 for recommended cables All wiring must be performed by a professional person 3 In case of children touch or insects go into the inverter Please make sure the inverter connector is fasten to waterproof posi on by twist i...

Страница 11: ...ct GS will switch on no voltage output G valve 9 10 reserved RSD 11 12 provide 12Vdc output when inverter is on ATS 230V output port when inverter is on Note For EU model 7 6 8kW 230V 50Hz 1pcs CT is needed only and the secondary side of the CT should be connected to 5 6 port CT L2 CT L1 CT L2 Gen ATS N O Relay Neutral Earth Bond 240V Coil Inverter 11 12 ATS GS diesel generator startup signal rela...

Страница 12: ...3 3 2 Ba ery temperature connec on 1 2 Temp CT 10 ...

Страница 13: ...wer source please install a separate AC breaker between inverter and AC input power source This will ensure the inverter can be securely disconnected during maintenance and fully protected from over current of AC input The recommended of AC breaker is 50A for 5kw and 80A for 8KW There are three terminal blocks with Grid Load and GEN markings Please do not misconnect input and output connectors All...

Страница 14: ...to protect your appliance but some mes it s ll causes internal damage to the air condi oner Before connec ng to PV modules please install a separately DC circuit breaker between inverter and PV modules It is very important for system safety and efficient opera on to use appropriate cable for PV module connec on To reduce risk of injury please use the proper recommended cable size as below Chart 3 4 ...

Страница 15: ...or posi ve and nega ve conductors 2 Suggest to put bootlace ferrules on the end of posi ve and nega ve wires with a proper crimping tool 3 Check correct polarity of wire connec on from PV modules and PV input connectors Then connect posi ve pole of connec on wire to posi ve pole of PV input connector Connect nega ve pole of connec on wire to nega ve pole of PV input connector Close the switch and ...

Страница 16: ...3 6 CT Connec on Region EU Region US Inverter N L N L N L N L White wire 5 6 Black wire Grid L N CT 5 6 Grid Inverter N L2 L1 N L2 L1 White wire 3 4 5 6 3 4 5 6 Black wire L1 L2 N CT1 CT2 14 ...

Страница 17: ...tra ons of the Wi Fi Plug 3 7 Earth Connec on mandatory Ground cable shall be connected to ground plate on grid side this prevents electric shock if the original protec ve conductor fails Note When the inverter is in the off grid state the N line needs to be connected to the earth ...

Страница 18: ...tem for Inverter Region EU Battery Solar Breaker Breaker Breaker Earth BAR 5 6 CT CAN Generator Microinverter Smart Load L N PE Breaker or Load Inverter 16 Arrow pointing to grid Ground Ground N L2 L1 N L2 L1 N L2 L1 ...

Страница 19: ...S 17 Battery Solar Breaker Breaker Breaker Breaker Earth BAR 3 6 4 5 CT CT CAN Generator Microinverter Smart Load L2 L1 N PE Breaker or Load Ground Ground Inverter N L2 L1 N L2 L1 N L2 L1 Arrow pointing to grid ...

Страница 20: ...arallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 Master inverter Slave Inverter Slave Inverter Load GEN Grid Parallel box Parallel A Parallel B Grid Load L N PE Inverter Inverter No 3 slave Ground Inverter No 2 slave Inverter No 1 master Battery pack ...

Страница 21: ...wire CAN N wire PE wire 3 11 Split phase parallel connec on diagram Parallel Master Slave Modbus SN 01 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 Master inverter Slave Inverter Slave Inverter ...

Страница 22: ...l box Parallel A Parallel B 3 12 Three phase Parallel Inverter Parallel Master Slave Modbus SN 01 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 A Phase Master inverter B Phase Master inverter C Phase Master inverter ...

Страница 23: ...ee phase Parallel Master Slave Modbus SN 01 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 A Phase Master inverter B Phase Master inverter C Phase Master inverter L1 L1 L2 L2 L1 L2 L3 L1 L2 N PE L1 L1 L2 L2 L1 L2 L3 L1...

Страница 24: ... on and Display Panel The opera on and display panel shown in below chart is on the front panel of the inverter It includes four indicators four func on keys and a LCD display indica ng the opera ng status and input output power informa on Chart 4 1 LED indicators LED Indicator DC AC Normal Alarm Green led solid light Green led solid light Green led solid light Red led solid light PV Connec on nor...

Страница 25: ...et bu on you can enter into the system setup screen which including Basic Setup Ba ery Setup Grid Setup System Work Mode Generator port use Advanced func on and Li Ba info 4 The main screen showing the info including Solar Grid Load and Ba ery Its also displaying the energy flow direc on by arrow When the power is approximate to high level the color on the panels will changing from green to red so ...

Страница 26: ...Main Screen Solar Page Solar Graph Grid Graph BMS Page Load Graph Battery Setting System Work Mode Grid Setting Gen Port Use Basic Setting Advanced Function Device info Grid Page Inverter Page Battery Page Load Page System Setup 24 ...

Страница 27: ...will enter into the power curve page Status Power Frequency CT1 CT2 External Current Sensor Power BUY Energy from Grid to Inverter L1 L2 Voltage for each Phase LD1 LD2 Internal Current Sensor Power SELL Energy from Inverter to Load Power 44W DC T 52 6C AC T 41 0C L1 240V l1 0 6A Inverter This is Inverter detail page Inverter Genera on Voltage Current Power for each Phase DC T mean DC DC temperatur...

Страница 28: ... 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 6 7 8 9 10 11 12 13 14 15 Curr Volt Curr Temp SOC Energy Charge Fault Sum Data Details Data Li BMS Solar power curve for daily monthly yearly and total can be roughly checked on the LCD for more accuracy power genera on pls check on the monitoring system Click the up and down arrow to check power...

Страница 29: ...7 Factory Reset Reset all parameters of the inverter Lock out all changes Enable this menu for se ng parameters that require locking and cannot be set up Before performing a successful factory reset and locking the systems to keep all changes you need to type in a password to enable the se ng The password for factory se ngs is 9999 and for lock out is 7777 This is System Setup page Factory Reset P...

Страница 30: ...attery Setting Start A 30 30 40A 40A Batt Set2 This is Ba ery Setup page Start 30 Percent S O C at 30 system will AutoStart a connected generator to charge the ba ery bank A 40A Charge rate of 40A from the a ached generator in Amps Gen Charge uses the gen input of the system to charge ba ery bank from an a ached generator Gen Signal Normally open relay that closes when the Gen Start signal state i...

Страница 31: ...ut will resume Float V 53 6V 20 35 50 5 Absorption V 57 6V Equalization V 57 6V Equalization Days Shutdown Low Batt Restart TEMPCO mV C Cell Batt Resistance 30 days Equalization Hours 3 0 hours 25mOhms Battery Setting Set3 Batt Recommended ba ery se ngs Battery Type AGM or PCC Absorption Stage 14 2v 57 6v 13 4v 53 6v Float Stage Torque value every 30 days 3hr 14 2v 57 6v Gel 14 1v 56 4v 13 5v 54 0...

Страница 32: ...r will only provide power to the backup load connected The hybrid inverter will neither provide power to the home load nor sell power to grid The built in CT will detect power flowing back to the grid and will reduce the power of the inverter only to supply the local load and charge the ba ery Zero Export To CT Hybrid inverter will not only provide power to the backup load connected but also give p...

Страница 33: ...18 00 01 00 when ba ery SOC is higher than 35 hybrid inverter will discharge the ba ery un l the SOC reaches 35 Time Of Use Time System Work Mode Batt Grid Charge Gen 01 00 05 00 08 00 10 00 15 00 18 00 5 00 8 00 10 00 15 00 18 00 01 00 Power 8000 8000 8000 8000 8000 8000 80 40 40 80 40 35 Work Mode2 For example Solar Sell Solar sell is for Zero export to load or Zero export to CT when this item i...

Страница 34: ...0V Vstop 0 0V 0 0 s V2 0 0V Q2 0 00 V3 0 0V Q3 0 00 V4 0 0V Q4 0 00 0 0 s Grid Set3 Grid Setting L HVRT L HFRT HV2 0 0V HV1 0 0V LV1 0 0V LV2 0 0V LV3 0 0V 0 16S 0 16S 0 16S 0 16S 0 16S HF2 0 00HZ HF1 0 00HZ LF1 0 00HZ LF2 0 00HZ 0 16S 0 16S 0 16S 0 16S Grid Set4 Please select the correct Grid Mode in your local area If you are not sure please choose General Standard Please select the correct Grid...

Страница 35: ... at which the Smart load will switch on And at the same me the PV input power should exceed the se ng value Power simultaneously and then the Smart load will switch on On Grid always on When click on Grid always on the smart load will switch on when the grid is present Micro Inv Input To use the Generator input port as a micro inverter on grid inverter input AC coupled this feature will also work ...

Страница 36: ...o cuts off Earth Neutral load port N line bond via connect external relay When the inverter disconnects from the grid ATS port voltage will be 0 and the Earth Neutral bond keeps on More details please refer to le picture coil external relay closed contact L N ATS load port Inverter shell Ground cable 230V Ex_Meter For CT when in Three phase system with CHNT Three phase energy meter DTSU666 click co...

Страница 37: ... 70A 30 6C 52 0 26 0Ah 0 0V 0 0A 0 0 0 50 33V 19 10A 31 0C 51 0 25 5Ah 53 2V 25 0A 0 0 0 50 30V 16 90A 30 2C 12 0 6 0Ah 53 2V 25 0A 0 0 0 4 5 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 ...

Страница 38: ...DC cable Generator Grid Backup Load On Grid Home Load Battery Solar CT AC cable DC cable Smart Load Mode III With Generator Mode IV With Smart Load Grid Backup Load On Grid Home Load Battery Solar On Grid AC couple AC cable DC cable On Grid Inverter Mode V AC Couple ...

Страница 39: ...r status displayed on the LCD is as detailed as possible 5 Your contact informa on In order to give you a clearer understanding of the inverter s fault informa on we will list all possible fault codes and their descrip ons when the inverter is not working properly The 1st priority power of the system is always the PV power then 2nd and 3rd priority power will be the ba ery bank or grid according t...

Страница 40: ...oad power connected 3 Turn off the DC switch and AC switch and then wait one minute then turn on the DC AC switch again 4 Seek help from us if can not go back to normal state Leakage current fault 1 Check PV side cable ground connection 2 Restart the system 2 3 times 3 If the fault still exists please contact us for help Remotely shutdown 1 it tells the inverter is remotely controlled and is in of...

Страница 41: ... is in the range of specification or not 2 Check whether AC cables are firmly and correctly connected 3 Seek help from us if can not go back to normal state F56 DC busbar voltage is too low Battery voltage low 1 Check whether battery voltage is too low 2 If the battery voltage is too low using PV or grid to charge the battery 3 Seek help from us if can not go back to normal state F58 BMS communica...

Страница 42: ...ct is replaced by the company itself during the warranty period all rights and interests of the replacement product or component belong to the company Factory warranty does not include damage due to the following reasons Damage during transporta on of equipment Damage caused by incorrect installa on or commissioning Damage caused by failure to comply with opera on instruc ons installa on instruc o...

Страница 43: ...ker AC Output Data 22 9A 2 mes of rated power 10 S 35A 40A 50A 50A 36 7A 38 5A 20 8A 27 5A 25A 34 9A 36 3A 31 7A 33A 33 4A 35A 1 1 5000 5500 2 1 6000 6600 2 2 7600 8360 2 2 8000 8800 Rated AC Output and UPS Power W 50 60Hz 120 240Vac split phase 208Vac 2 3 phase 230Vac single phase Split phase 2 3 phase Single Phase Output Frequency and Voltage Grid Type THD 3 Linear load 1 5 97 60 Current Harmoni...

Страница 44: ...ions and Standards Grid Regula on IEC62109 1 IEC62109 2 Safety Regula on EN61000 6 1 EN61000 6 3 FCC 15 class B EMC General Data Protec on Degree Opera ng Temperature Rande Cooling Noise dB Communica on with BMS Weight kg Size mm Installa on Style Warranty 25 60 45 Dera ng 30 dB Smart cooling RS485 CAN 32 420W 670H 233D IP65 5 years Wall mounted ...

Страница 45: ...8 Need confirm CAN_H CAN_L note 48V Storage inverter RS485orCAN 12 3 11 0 0 0 13 CAN CAN CAN CAN RS485 RS485 RS485 Model US2000 US2000 PLUS B4850 POWERBOXF 48Vxxxx 48Vxxxx 48Vxxxx 48Vxxxx HY48050 48Vxxxx BMS48150 H4850M UZ EB51 2 100 A11 Brand CCGX SOLAX UZ ENERGY SACRED SUN Topakpower GSL GenixGreen PYLON DYNESS Herewin techlogy Sunwoda X ratong Enershare Technology PYLON 3 0 GS10000 BPE AOBOET A...

Страница 46: ...Add No 26 30 South Yongjiang Road Beilun 315806 Ningbo China Fax 86 0 574 8622 8852 Tel 86 0 574 8622 8957 E mail service deye com cn Web www deyeinverter com 502012022 Ver 2 0 2020 12 ...

Отзывы: