5.7 System Work Mode Setup Menu
Work Mode
Zero Export To Load
Zero Export To CT
Max Sell Power
Energy pattern
BattFirst
LoadFirst
System Work Mode
Solar Sell
Solar Sell
4000
Selling First
Work
Mode1
Lithium Mode
Shutdown
Low Batt
Restart
80%
30%
10%
00
Battery Setting
Set3
Batt
Grid Charge
Gen Charge
Grid Signal
Gen Signal
Gen Max Run Time
0.0 hours
Gen Down Time
0.5 hours
Battery Setting
Start
A
30%
30%
40A
40A
Batt
Set2
①
②
ʑ
This is Battery Setup page.
Start =30%---It indicates that the Generator will start when
the Battery capacity is less than 30% in Off-grid mode.
A = 40A---It indicates the Current that the Generator
charges the Battery after starting.
Gen Charge---It indicates the Switch that the Generator
charges the Battery。
Gen Signal ---It indicates whether the Generator's ATS
signal is on or off.
Start =30%---No use,Just for customization.
A = 40A--- It indicates the Current that the Grid
charges the Battery.
Grid Charge---It indicates that the grid charges the battery.
Grid Signal ---Disable.
Gen Max RunTime ---It indicates the longest time
Generator can run in one day,when time is up, the
Generator will be turned off. 24H means that it does
not shut down all the time.
Gen DownTime ---It indicates the delay time of the
Generator to shut down after it has reached the running
time.
ʏʑ
This is Grid Charge, you need select.
ʐ
Lithium Mode--This is BMS protocol.Please reference the
document(Approved Battery-Deye).
Shutdown 10%--It indicates the inverter will shutdown if
the SOC below this value.
Low Batt 20% --It indicates the inverter will alarm if the
SOC below this value.
Restart 40% --It indicates the restart level when inverter
shutdown.
There are 4 stages of charging the Battery .
ʏ
ʐ
This is for professional installers,you can keep it if you
do not know.
Shutdown 41V--The inverter will shutdown if the Voltage
below this value.
Low Batt 45V --The inverter will alarm if the Voltage
below this value.
Restart 52V --Restart level when inverter shutdown.
ʑ
Float V
55.2V
41.0V
45.0V
52.0V
-5
Absorption V
57.6V
Equalization V
58.8V
Equalization Days
Shutdown
Low Batt
Restart
TEMPCO(mV/C/Cell)
Batt Resistance
90 days
Equalization Hours
2.0
hours
25mOhms
Battery Setting
Set3
Batt
ʏ
ʐ
ʑ
Work Mode
Selling First :It means that the excess energy has
priority in grid connection.
Zero Export To Load:It means output power according
to it consumed by the load.
Zero Export To CT :It means output power according
to the CT position.
Solar Sell :It means that the excess solar energy
can be integrated into the grid.
Max Sell Power 0-8000W
Energy Pattern
BattFirst--- It means solar power will charge battery first,
when battery is full then feed-out power to the
Load or Grid.
LoadFirst-- The solar energy will be used to supply the
local load first,then to charge the battery.The
redundant power will export to the public grid.
Time Of Use
Time
System Work Mode
Batt
~
~
~
~
~
~
Grid
Charge
Gen
01:00
5:00
05:00
9:00
09:00
13:00
13:00
17:00
17:00
21:00
21:00
01:00
80%
80%
80%
80%
80%
80%
Work
Mode2
ʏ ʐ
ʑ
Time of use
ʏ
ʐ
ʑ
Switch for Grid charging the battery.
Switch for Gen charging the battery.
There are six time period can be set,
each period must from small to large.
- 23 -
- 24 -