background image

5.7 System Work Mode Setup Menu

Work Mode

Zero Export To Load

Zero Export To CT

Max Sell Power 

Energy pattern

BattFirst

LoadFirst

System Work Mode

Solar Sell

Solar Sell

4000

Selling First

Work

Mode1

This is Battery 4 tages charge voltage.

ʏ

ʐ

This is for professional installers,you can hold default 
if you do not know.

Shutdown 10%--the inverter will shutdown if the SOC is 
                                 below this.
Low Batt 20%   --the inverter will alarm if the SOC is 
                                 below this.

Restart 40%       --Restart level when inverter shutdown.

ʑ

Float V

55.2V

41.0V

45.0V

52.0V

-5

Absorption V

57.6V

Equalization V

58.8V

Equalization Days

Shutdown

Low Batt

Restart

TEMPCO(mV/C/Cell)

Batt Resistance

90 days

Equalization Hours

2.0 

hours

25mOhms

Battery Setting

Set3

Batt

ʏ

ʐ

ʑ

Work Mode
Selling First                   :It means that the excess energy has 
                                           priority in grid connection.
Zero Export To Load:It means output power according 
                                           to it consumed by the load.
Zero Export To CT    :It means output power according 
                                           to the CT position.
Solar Sell                       :It means that the excess solar energy 
                                          can be integrated into the grid.
Max Sell Power 0-8000W
Energy Pattern
BattFirst--- It means solar power will charge battery first,
                      when battery is full then feed-out power to the 
                      Load or Grid.
LoadFirst-- The solar energy will be used to supply the 
                       local load first,then to charge the battery.The 
                       redundant power will export to the public grid.

Time Of Use

Time

System Work Mode

Batt

~

~

~

~

~

~

Grid

Charge

Gen

01:00

5:00

05:00

9:00

09:00

13:00

13:00

17:00

17:00

21:00

21:00

01:00

80%

80%

80%

80%

80%

80%

Work

Mode2

ʏ ʐ

ʑ

Time of use

ʏ
ʐ

ʑ

Switch for Grid charging the battery.

Switch for Gen charging the battery.

There are six time period can be set,
each period must from small to large. 

5.8 Grid Setup Menu

For California only.

Grid Setting

Grid Mode

Grid Type

General Standard

UL1741

ͥ

IEEE1547

CPUC RULE21

SRD-UL-1741

120/240V Split Phase

120/208V 3 Phase

120V Single Phase

220V Single Phase

Grid

Set1

PF

Grid Frequency

Reconnection Time

Grid Vol High

Grid Vol Low

Grid HZ High

Grid HZ Low

Grid Setting

50HZ

60HZ

1.000

60S

265.0V

185.0V

60.5Hz

59.3Hz

Grid

Set2

Grid Setting

Q(V)

FW

Normal Ramp rate

Soft Start Ramp rate

VW

V1:0.0V

Q1:0.00

Fstart:0.00Hz

Fstop:0.00Hz

Vstart:0.0V

Vstop:0.0V

0.0%/s

V2:0.0V

Q2:0.00

V3:0.0V

Q3:0.00

V4:0.0V

Q4:0.00

0.0%/s

Grid

Set3

Grid Setting

L/HVRT

L/HFRT

HV2:0.0V

HV1:0.0V

LV1:0.0V

LV2:0.0V

LV3:0.0V

0.16S

0.16S

0.16S

0.16S

0.16S

HF2:0.00HZ

HF1:0.00HZ

LF1:0.00HZ

LF2:0.00HZ

0.16S

0.16S

0.16S

0.16S

Grid

Set4

Please select the correct Grid Mode in your local area. If 
you are not sure, please choose General Standard.

Please select the correct Grid Type in your local area,
otherwise the machine will not work or be damaged.

Please select the correct Grid Frequency in your local area.

UL1741&IEEE1547,CPUC RULE21,SRD-UL-1741

No need to set the function of this interface.

General Standard

You can hole this in default value。

For California only.

- 27 -

- 28 -

Содержание INGE

Страница 1: ...US EU SUN 8K SG01LP1 US EU SUN 6K SG01LP1 US SUN 5K SG01LP1 US User Manual R Add No 26 30 South Yongjiang Road Beilun 315806 Ningbo China Fax 86 0 574 8622 8852 Tel 86 0 574 8622 8957 E mail wutz deye com cn Web www deyeinverter com KX ...

Страница 2: ...er Curve 3UJK G RZ OTLUXSGZOUT GTJ VXUIKYYOTM 2OSOZGZOUT UL 2OGHOROZ_ GZGYNKKZ 3 6 CT Connection 3 7 Earth Connection mandatory 3 8 WIFI Connection 3 9 Wiring System for Inverter Contents 5 6 Battery Setup Menu 5 4 System Setup Menu 5 5 Basic Setup Menu 5 3 Curve Page Solar Load Grid 5 7 System Work Mode Setup Menu 5 8 Grid Setup Menu 5 9 Generator Port Use Setup Menu 5 10 Advanced Function Setup ...

Страница 3: ...l may cause a spark or short circuit in batteries or other electrical parts even cause an explosion Please strictly follow installation procedure when you want to disconnect AC or DC terminals Please refer to Installation section of this manual for the details Grounding instructions this inverter should be connected to a permanent grounded wiring system Be sure to comply with local requirements an...

Страница 4: ...optimized battery performance Time of use function Smart Load Function The following illustration shows basic application of this inverter It also includes following devices to have a Complete running system Generator or Utility PV modules Consult with your system integrator for other possible system architectures depending on your requirements This inverter can power all kinds of appliances in ho...

Страница 5: ...wn in the diagram to guarantee sufficient heat dissipation and have enough space for removing wires Please select a vertical wall with load bearing capacity for installation suitable for installation on concrete or other non flammable surfaces installation is shown below Install this inverter at eye level in order to allow the LCD display to be read at all times For proper air circulation to dissi...

Страница 6: ...attery cable with correct connector which can well fit into the battery terminals 2 Use a suitable screwdriver to unscrew the bolts and fit the battery connectors in then fasten the bolt by the screwdriver make sure the bolts are tightened with torque of 24 5 N M 2 Nm in clockwise direction make sure polarity at both the battery and inverter is correctly connected 3 In case of children touch or in...

Страница 7: ...sure to open DC protector or disconnector first 2 Remove insulation sleeve 10mm length unscrew the bolts insert the AC input wires according to polarities indicated on the terminal block and tighten the terminal screws Make sure the connection is complete All wiring must be performed by a qualified personnel It is very important for system safety and efficient operation to use appropriate cable fo...

Страница 8: ...ative conductors 2 Suggest to put bootlace ferrules on the end of positive and negative wires with a proper crimping tool 3 Check correct polarity of wire connection from PV modules and PV input connectors Then connect positive pole of connection wire to positive pole of PV input connector Connect negative pole of connection wire to negative pole of PV input connector Close the switch and make sur...

Страница 9: ...eeds to be connected to the earth 3 7 Earth Connection mandatory Ground cable shall be connected to ground plate on grid side this prevents electric shock if the original protective conductor fails Region EU Region US Inverter N L N L N L N L White wire 5 6 Black wire Grid L N CT 5 6 Note Grid Inverter N L2 L1 N L2 L1 White wire 3 4 5 6 3 4 5 6 Black wire L1 L2 N CT1 CT2 13 14 ...

Страница 10: ...ator Microinverter Smart Load L1 N PE Breaker or Load Ground Inverter N L N L N L Battery Solar Breaker Breaker Breaker Breaker Earth BAR 3 6 4 5 CT CT CAN Generator Microinverter Smart Load L2 L1 N PE Breaker or Load Generat Ground Inverter N L2 L1 N L2 L1 N L2 L1 15 16 Arrow pointing to grid Arrow pointing to grid ...

Страница 11: ...02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03 A Phase B Phase C Phase Advanced Function Paral Set3 Master inverter Slave Inverter Slave Inverter Parallel Master Slave Modbus SN 01 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 02 A Phase B Phase C Phase Advanced Function Paral Set3 Parallel Master Slave Modbus SN 03...

Страница 12: ...Green led solid light Green led solid light Green led solid light Red led solid light PV Connection normal Grid Connection normal Inverter operating normal Malfunction or warning Messages Chart 4 2 Function Buttons Function Key Esc Up Down Enter Description To exit setting mode To go to previous selection To go to next selection To confirm the selection 19 20 L wire CAN N wire PE wire Battery pack...

Страница 13: ...use Advanced function and Li Batt info 4 The main screen showing the info including Solar Grid Load and Battery Its also displaying the energy flow direction by arrow When the power is approximate to high level the color on the panels will changing from green to red so system info showing vividly on the main screen PV power and Load power always keep positive Grid power negative means sell to grid...

Страница 14: ... 200 KWh System Solar Power Year CANCEL Day Month Year Total Total 400 0 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 800 1200 1600 2000 2000KWh CANCEL Day Month Year Total System Grid Power Total 5 3 Curve Page Solar Load Grid This is Battery detail page if you use Lithium Battery you can enter BMS page Power 42W Today 0 0 KWH Total 0 80 KW...

Страница 15: ...0 40A 40A Batt Set2 ʑ This is Battery Setup page Start 30 It indicates that the Generator will start when the Battery capacity is less than 30 in the condition of Off grid mode A 40A It indicates the Current that the Generator charges the Battery after started Gen Charge The Switch that the Generator charges the Battery Gen Signal It indicates whether the Generator s ATS signal is on Max RunTime x...

Страница 16: ...o the public grid Time Of Use Time System Work Mode Batt Grid Charge Gen 01 00 5 00 05 00 9 00 09 00 13 00 13 00 17 00 17 00 21 00 21 00 01 00 80 80 80 80 80 80 Work Mode2 ʏ ʐ ʑ Time of use ʏ ʐ ʑ Switch for Grid charging the battery Switch for Gen charging the battery There are six time period can be set each period must from small to large 5 8 Grid Setup Menu For California only Grid Setting Grid...

Страница 17: ...2C 12 0 6 0Ah 53 2V 25 0A 0 0 0 4 5 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0 0 0Ah 0 0V 0 0A 0 0 0 0 00V 0 00A 0 0C 0 0...

Страница 18: ...r On Grid AC couple AC cable DC cable Single Phase Inverter 3UJK OZN 5T XOJ T KXZKX 31 32 Grid Backup Load On Grid Home Load Battery Solar CT AC cable DC cable Generator Grid Backup Load On Grid Home Load Battery Solar CT AC cable DC cable Smart Load Grid Backup Load On Grid Home Load Battery Wind CT AC cable DC cable UTZXURRKX OTJ XHOTK 3UJK OZN OTJ XHOTK 3UJK OZN KTKXGZUX 3UJK OZN 9SGXZ 2UGJ 1 I...

Страница 19: ...er are within the range 2 Restart and check whether it is in normal 3 Seek help from us if can not go back to normal state DC side over current fault 1 Check PV module connect and battery connect 2 Turn off the DC switch and AC switch and then wait one minute then turn on the DC AC switch again 3 Seek help from us if can not go back to normal state Leakage current fault 1 Check the cable of PV mod...

Страница 20: ...US SUN 6K SG01LP1 US SUN 8K SG01LP1 US EU SUN 7 6K SG01LP1 US EU GZZKX_ TV Z GZG Battery Type Lead acid or lithium ion Battery Voltage Range V 40V 60V Max Charging Current A Max Discharging Current A 120A 120A 135A 135A 190A 190A 190A 190A Charging Curve External Temperature Sensor Charging Strategy for Li Ion Battery 6 9ZXOTM TV Z GZG Max DC Input Power W PV Input Voltage V MPPT Range V Start up ...

Отзывы: