Aurora Shelving Products 6”
Drawer Installation Instructions
Figure 1
Figure 2
Figure 3
Figure 5
Back of Slide
Lances
Slide Bracket
Rivet
Bracket
Part No. 3524 Rev. A
®
NOTE: Shelving unit must be anchored to the
floor through the Quik-Bases in front and back
and must be anchored to a wall or other shelv-
ing unit in back.
1. Starting from the bottom, install shelf supports
in the front and back (4) keyhole slots (6”) up
from the Quik-Base. Secure the back shelf
support to the posts using a Tek screw
through the holes in the ears of the shelf
support (see figure 1).
2. Install slides in slide brackets by slipping
lances in slides into the slots in the slide brack-
ets. (LH slide in LH bracket, RH slide in RH
bracket (see figure 2).
3. Drop the ears of the slide brackets into the top
of the channel of the shelf supports and se-
cure using #10-32 x
1
/
2
screws and #10 nuts.
(see figures 3). If this is your second drawer or
more, install the wire interlock rod between the
slides on each side (see figure 5).