S-Hook and
#1 Double-Loop Chain
Prepare mounting surface, if necessary weld blocks, drill holes (see figure 3.5).
NOTE
:
The burner control box and radiant tubes should be in straight alignment and level.
Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.
Attach and close S-Hook (P/N: S-HOOK) and #1 double-loop chain (P/N: THCS) to anchor. Check
that it is securely attached.
NOTE
: Threaded rod and turnbuckles may be used.
Attach hangers to chains. Adjust chain lengths until radiant tubing is level and equal weight distribution
is achieved. Chains must be straight up and down. Do not install chains at an angle as this can result
in tube warpage or separation.
Figure 3.5
•
Mounting the Hangers
Wood Beam
Concrete Beam
Beam Clamp
Screw Hook
Screw Hook
with Locknut
and Washer
Threaded Rod
and Turnbuckle
Threaded Rod
Chain
3.0
Installation
•
Hanger Placement and Suspension
I-Beam
Beam Clamp
Chain
Chain
I-Beam