Quick Installation Guideline
Grid-tie Transformerless Solar Inverter
Current sensor for H5A
_222
● This document briefly explains how to install a current sensor.
This document applies to H5A
_222
.
Caution
Make sure that the connector of the current sensor to be connected and the
cable for the current sensor are connected correctly.
Do not pull the cable strongly.
If the direction and location of the current sensor are wrong or the lock is
incomplete, accurate measurement will not be possible.
Also, if you drop or apply an impact, accurate measurement will not be possible.
The current sensor has polarity. Install the current sensor so that the power
company side is on the grid side and the indoor side is on the main earth leakage
breaker side.
1
1
Current sensor
(
Φ16
)
No
Exterior
Qty
Object
Model
PPM CT16_101
1. Accessories contents
2. External dimensions
10000mm
or
30000mm
150mm
L
31mm
29mm
44.5mm
30mm
150mm
18.5mm
Φ
16
3. Remove the function port
More H5A
_222
details please scan QR-code for user manual.
2
1
Current sensor
cable
30m: PPM W2_230
10m: PPM W2_210
Digital input
Power meter
Dry contact
* Screw torque required for
assembling: 8±2 kgf-cm