background image

Quick Installation Guideline

Grid-tie Transformerless Solar Inverter

Current sensor for H5A

_222

● This document briefly explains how to install a current sensor.

This document applies to H5A

_222

.

Caution

Make sure that the connector of the current sensor to be connected and the

cable for the current sensor are connected correctly.

Do not pull the cable strongly.

If the direction and location of the current sensor are wrong or the lock is

incomplete, accurate measurement will not be possible.

Also, if you drop or apply an impact, accurate measurement will not be possible.

The current sensor has polarity. Install the current sensor so that the power

company side is on the grid side and the indoor side is on the main earth leakage

breaker side.

1

1

Current sensor

Φ16

No

Exterior

Qty

Object

Model

PPM CT16_101

1. Accessories contents

2. External dimensions

10000mm

or

30000mm

150mm

L

31mm

29mm

44.5mm

30mm

150mm

18.5mm

Φ

16

3. Remove the function port

More H5A

_222

 details please scan QR-code for user manual.

2

1

Current sensor

cable

30m: PPM W2_230

10m: PPM W2_210

Digital input

Power meter

Dry contact

* Screw torque required for

  

assembling: 8±2 kgf-cm

- https://mydeltasolar.deltaww.com/?p=product_manual