4421 Tradition Trail ● Plano, Texas 75093 ● 972-964-2700 ● 800-836-7472
SP-ENG-210-100-06 Rev 1.9 3 |
P a g e
TABLE OF CONTENTS
Overview
4
Inspecting the Equipment
4
Unpacking the Air Conditioner
4
Moving the Air Conditioner
5
Unit Label
5
Operation
5
Preliminary Testing
8
Mounting the Air Conditioner
9
Unit Specifications
10
Options
12
System Faults
14
Digital Temperature Controller Programming
14
Preventative Maintenance
17
Field Serviceable Parts
18
Safety Information
18
Troubleshooting Guide
19
Physical Dimensions
22
Electrical Schematic
24
Warranty Information
25
Return Material Authorization (RMA) Procedure
26
Appendix A
– Power Terminal Block
27