-
12
-
4.2 Assembly SOP
Preparation before assemble
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, material as bellow:
1) Working table
2) Philips-head screwdriver
3) Glove
4) Cleaning cloth
5) ESD protection
6) U4919DW Curve Sponge Jig
Item
Picture
Operation
Tools
Notes
1
1. Assemble AC wire and
Power BD to main
shielding
2. Plug EDP wire into
I/FBD Paste yellow
tape and adhesive
tape
3. Plug Driver Board wire
and Power BD wire
into I/F BD and
assemble I/FBD into
Main Shielding
4. Plug Driver BD wire
into I/F BD and
assemble I/FBD into
Main Shielding.
Paste 1 adhesive tape
to fix EDP wire
I/F BD
I/F BD
LED DRV
BD
Содержание U4919DWb
Страница 1: ... 1 Simplified Service Manual U4919DWB Version 01 Date 2021 02 04 ...
Страница 7: ... 7 3 Wiring connectivity diagram FFC 1 Wire 1 FFC 2 Wire 6 Wire5 Wire 3 Wire 3 Wire 2 ...
Страница 16: ... 16 5 Trouble shooting instructions ...
Страница 17: ... 17 ...
Страница 18: ... 18 ...
Страница 19: ... 19 ...
Страница 20: ... 20 ...
Страница 21: ... 21 ...
Страница 22: ... 22 ...
Страница 23: ... 23 ...
Страница 24: ... 24 ...
Страница 25: ... 25 ...