3
DELL S2422HGB
S14
Unlock 2 screws from Middle Frame
Disassemble PWR BTN from Middle
Frame
(Screw Torque: 1.8~2.0kgf)
S15
Unlock 2 screws from PWR BTN
Disassemble “LENS BD (PWR BTN
BD)” from PWR BTN
(Screw Torque: 0.95~1.05kgf)
S16
Tear off 2 tape on the connector of
Backlight wire
Remove Backlight wire from panel
S17
Remove 2 pieces of small Mylar on the
Panel
S18
Remove Mylar from SPS BD
S19
Unlock 8 PCBA screws
(Screw Torque: 8.5±1.0kgf)
S20
Disassemble I/F BD from Main SHD
and remove SPS BD wire from I/F BD
Disassemble SPS BD from Main SHD
S21
Remove “LVDS FFC cable” and “WIRE
6P/10P” from I/F BD