Figure 15. Installing the Chassis with ReadyRails in a Threaded-Hole Rack
Using a Rack Mount Tray (Optional)
You can also use a rack mount tray to install the C9010 switch in a 2- or 4-post rack. You must purchase
the tray as a separate item; it is not shipped with the C9010 switch.
NOTE: If the use of a rack bar or Dell ReadyRails does not satisfy your C9010 installation
requirements, Dell Networking recommends using a rack mount tray to support the weight of a
C9010 switch in a 4-post rack. For information about the chassis weight and other technical
specification, see
.
To install a rack mount tray in a 2- or 4-post rack, follow the instructions provided with the tray kit.
Decide on the desired height at which you want to mount the switch in the rack. Position the tray at that
height and tighten it to the rack posts using the screws shipped with the tray (items 1 to 4 in Figure 15).
Installing the Hardware