
5-10
Installation and Service Guide
5.2.2.
Installing the Vertical Cable Management Kit
The vertical management kit secures your cables within the cabinet and helps
you manage excess cabling.
You can install up to 9 cable management kits on a side panel. The following
procedure describes how to install 3 kits.
Required Tools
M4 Allen wrench
Required Fixtures
Vertical cable management kit with
fixtures
Procedure
1. Using the M4 Allen wrench, screw the top vertical cable management bar
using screws.
Содержание M3S2G8
Страница 4: ......
Страница 20: ......
Страница 46: ...4 14 Installation and Service Guide 4 Stick some wire saddles on the inside of the door Rear view ...
Страница 48: ...4 16 Installation and Service Guide 4 Install the door central part on the outside of the door Front view ...
Страница 60: ...4 28 Installation and Service Guide 4 Install the door central part on the outside of the door Front view ...
Страница 67: ...Chapter 4 Servicing the Doors 4 35 4 Stick some wire saddles on the inside of the door Rear view ...
Страница 69: ...Chapter 4 Servicing the Doors 4 37 4 Install the door central part on the outside of the door Front view ...
Страница 80: ...5 4 Installation and Service Guide 5 Proceed in the same way from the rear of the cabinet ...
Страница 84: ...5 8 Installation and Service Guide 5 Proceed in the same way from the rear of the cabinet ...
Страница 96: ......
Страница 100: ......
Страница 106: ......