Installation of the equipment in the cabinet
Install equipment in the cabinet or rack. Always begin component installation at the bottom of the cabinet and work
upward. Install components at the lowest available space for that component type.
Placement of the equipment in the cabinet is dependent on the type of power distribution units installed in the cabinet.
Refer to the equipment stack up guidelines for each type of power distribution.
l
Install the servers as described in the following sections. Most of the servers will function as VxFlex Ready
Node nodes, and at least one will function as a management server. The procedures for physical installation in
the rack or cabinet apply to both types. Once the servers have been installed, refer to the
VxFlex Ready Node
Hardware Configuration and Operating System Installation Guide
(for your system's operating system), for server
configuration and operating system installation procedures.
l
Install the management switches
l
Install the data switches
R740xd configuration installation guidelines
Minimum and maximum stack up configurations are provided in this topic.
Assuming installation is into an empty rack, always begin component installation at the
bottom of the cabinet and work upward. Install components at the lowest available
space for that component type.
If you are installing the minimum configuration, the stack up will be as follows:
Table 14 Stack up for a minimum configuration
Component Function
Description
Quantity
Cabinet U Space
Data Server
R740xd Server
3
2 - 7
Management Server
Management Server
1
20
Management Switch
Customer provided 1 GbE
switch
1
21
Data Switch
Customer provided 10 GbE
switch
2
23 - 24
If you are installing the maximum configuration, the stack up will be as follows:
Table 15 Stack up for a maximum configuration
Component Function
Description
Quantity
Cabinet U Space
Data Server
R740xd Server
17
2 - 19 and 25 - 40
Management Server
Management Server
1
20
Management Switch
Customer provided 1 GbE switch
1
21
Data Switch
Customer provided 10 GbE switch 2
23 - 24
The following illustration represents the maximum R740xd configuration.
R740XD Configuration Equipment Installation
58
Dell EMC VxFlex Ready Node Server Installation Guide
Содержание EMC VxFlex Ready Node
Страница 1: ...Dell EMC VxFlex Ready Node Server Installation Guide Rev 01 October 2019 ...
Страница 6: ...Figures 6 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 8: ...Tables 8 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 16: ...Before You Begin 16 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 18: ...R640 Procedures 18 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 56: ...R740XD Procedures 56 Dell EMC VxFlex Ready Node Server Installation Guide ...
Страница 80: ...R840 Procedures 80 Dell EMC VxFlex Ready Node Server Installation Guide ...