![Dell EMC ScaleIO Ready Node 14G Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/dell/emc-scaleio-ready-node-14g/emc-scaleio-ready-node-14g_hardware-installation-manual_85152065.webp)
Table 16 Stack up for a maximum configuration (continued)
Component
Function
Description
Quantity
Cabinet U Space
Management Switch
Customer provided 1
GbE switch
1
21
Data Switch
Customer provided 10
GbE switch
2
23 - 24
The following illustration represents the maximum 2U1N configuration.
Figure 23 Cabinet stack up for 2U1N configurations
Identifying the kit components
The sliding rail assemblies allow the server to be secured in the cabinet, and extended
from the cabinet so that the system cover can be removed to access the internal
2U1N Configuration Equipment Installation
Identifying the kit components
65
Содержание EMC ScaleIO Ready Node 14G
Страница 1: ...EMC ScaleIO Ready Node 14G Hardware Installation Guide 302 004 321 REV 01 ...
Страница 6: ...FIGURES 6 Hardware Installation Guide ...
Страница 8: ...TABLES 8 Hardware Installation Guide ...
Страница 16: ...Before You Begin 16 Hardware Installation Guide ...
Страница 18: ...1U1N Procedures 18 Hardware Installation Guide ...
Страница 39: ...Figure 17 CMA bracket slots 1U1N Configuration Equipment Installation Connect and route cords and cables 39 ...
Страница 40: ...1U1N Configuration Equipment Installation 40 Hardware Installation Guide ...
Страница 48: ...Install AC Power Cables 48 Hardware Installation Guide ...
Страница 62: ...2U1N Procedures 62 Hardware Installation Guide ...
Страница 73: ...Figure 34 CMA bracket slots 2U1N Configuration Equipment Installation Connect and route cords and cables 73 ...
Страница 74: ...2U1N Configuration Equipment Installation 74 Hardware Installation Guide ...