92
Dell EMC Connectrix EC-1700 Cabinet Installation and Setup Manual
Installing Directors into the EC-1700 Cabinet
Connecting MDS 9718 power
The EC-1700-C contains no PDUs. Power for the MDS 9718 is
provided by connecting the MDS power cords directly to the
customer's facility power..
Order the same power cords you would normally order for
connecting the MDS 9718 directors to the customer's facility power
for the country of destination.
◆
Each MDS 9718 requires max of 8 power cords, depending on
configuration, for a fully loaded chassis with full power
redundancy.
◆
Each MDS 9718 requires max of 4 power cord per chassis,
depending on configuration
Note:
See the full MDS power specifications in the MDS 9700 documentation
on the Cisco website at Cisco.com. Search for 9718 power specifications.
Power cords for the MDS 9718 should be routed down the front of the
cabinet and either exit the cabinet at the lower rear of the cabinet or, if
on a raised floor into a small tile cut-out in an adjacent tile near the
rear of the cabinet, or down into a tile cut-out near the front of the
cabinet.
Alternatively, the power cords can be routed out the top of the
cabinet by removing one of the quick release perforated top panels.
MDS 9718 power cords should be routed to the front sides of the
cabinet and then either down or up and out of the cabinet, as shown
in
.
Содержание EMC Connectrix EC-1700 Series
Страница 8: ...Dell EMC Connectrix EC 1700 Cabinet Installation and Setup Manual 8 Figures ...
Страница 22: ...22 Dell EMC Connectrix EC 1700 Cabinet Installation and Setup Manual EC 1700 Cabinet Overview ...
Страница 28: ...28 Dell EMC Connectrix EC 1700 Cabinet Installation and Setup Manual EC 1700 Cabinet Specifications ...
Страница 110: ...110 Dell EMC Connectrix EC 1700 Cabinet Installation and Setup Manual Installing Directors into the EC 1700 Cabinet ...