Figure 11 Cable management assembly (CMA)
Identify the rack location to install the system
Identify the designated location for the system controller or controllers in the rack.
l
When using DD6300, DD6800, and DD9300 systems with ES30 shelves:
n
The designated location for a single node, or the primary node of an HA pair is
U13-U14 in rack 1.
n
The designated location for the standby node of an HA pair is U15-16 in rack 1.
l
When using DD6300, DD6800, and DD9300 systems with DS60 shelves:
n
The designated location for a single node, or the primary node of an HA pair is
U22-U23 in rack 1.
n
The designated location for the standby node of an HA pair is U25-26 in rack 1.
Note
The designated slots in the rack are the recommended location for the DD6300,
DD6800, and DD9300 systems to support the cabling described in this document.
Other locations may require different cable lengths for some configurations.
Install the rails
This procedures describes how to install the mounting rails.
Procedure
1. If EIA rail mounting holes of 7.1 MM diameter round, or M5, 12-24, 10-32
threaded, are being used, install the filler using the pin as shown. If not, proceed
to the next step.
Install the System in the Rack
Identify the rack location to install the system
41
Содержание DD6300
Страница 6: ...FIGURES 6 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...
Страница 8: ...TABLES 8 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...
Страница 10: ...Revision history 10 Data Domain DD6300 DD6800 and DD9300 Systems 6 1 Hardware Overview and Installation Guide ...