Figure 2 PSTN location on a DPE with 25-drive slots
PR
OD
ID
/SN
: F
NM01
234567
891
PN: 1
23-
456-
789
(OBE
RON)
PRO
D
ID/SN:
FNM01
23
45
67
89
1
PN
: 1
23
-45
6-7
89
(OB
ERO
N)
CL5780
Before installation of the chassis, pull the tag outward and record the information from
the tag on the Configuration Worksheet. After recording the information, return the
tag to its inserted position.
Note
Before installing the DPE, watch the Unity Quick Start Installation Video at
Installing the rails in the cabinet
Note
The snap-in rails are dedicated left and right, and cannot be interchanged.
Procedure
1. First, orient the rails. Face the front of the cabinet when orienting the left and
right rail placement. The front edge of each rail is stamped L or R.
2. From the rear of the cabinet, insert the adapters into the holes on the rear rack
channel with the rail extended as shown in
Push rail into rear channel mounting
.
Install your storage system components into a rack
Installing the rails in the cabinet
19