Figure 26. Installing air shroud for system with the rear drive configuration
Next steps
1
If removed,
2
Install the
3
Place the system into the rack. For more information, see the Rail Installation Guide available at
.
4
, install
5
Install the
6
Follow the procedure listed in
After working inside your system
.
Internal PERC riser
Removing the internal PERC riser
Prerequisites
1
Follow the safety guidelines listed in
2
Power off the system and all attached peripherals.
3
Disconnect the system from the electrical outlet, and disconnect the peripherals.
4
, remove
5
Remove the
.
6
Remove the system from the rack and place it on an ESD work bench. For more information, see the Rail Installation Guide available at
.
7
.
8
.
9
If installed,
54
Installing and removing system components