Installation Manual
Festoon Systems for I-Beams
Program 0314
MAL0300-0001-EN
www.conductix.com
translated document
page 44 of 56
8.2.2
Inspection with the system moving
CAUTION!
-
Any procedures that could threaten safety are to be avoided.
-
The system should only be commissioned with functional protective gear and safety devices.
-
It is forbidden to enter the operating area of the festoon system.
Inspection measures
Interval
Components
Measure
Description
Ev
ery
14 days
: 3 and 4
-s
hi
ft op
eration
at the lates
t after 300 oper
ational hours
Ev
ery
30 days
: 2
-s
hi
ft op
eratio
n
at the lates
t after 300 oper
ational hours
Rollers
Func
tional
che
ck
Easy and misalignment-free running of the main roller,
on the track beam running surfaces.
Visible wear, damage.
Cable trolley
for proper entry and exit of the cable trolleys in the
storage area
Track beam and support
of the track beam and the entire system, for dirt and
corrosion that influence functionality.
Should problems be identified during inspection, service work is urgent.
8.2.3
Logging
The results of inspections as well as the remedies performed are to be documented in written reports. Conductix-Wampfler must
be informed immediately of defects and malfunctions during the test phase and the warranty period.