background image

MARINA POWER DOCK INSTALLATION 

 

10 Mountain View Drive | Shelton, CT 06484 | P: 800-521-3175 | www.electri-cable.com 

9065-0269 REV B 

© ECA– January 2017—Product specifications subject to change without 

notice 

Page 1

 

Notes:  * Ensure all screws will not pierce finished work surface

  ** It is important that the Marina is centered in cutout and there is 

 a consistent air gap between the Marina and opening. 

 Surface Preparation: 

1-

Provide a cutout in surface for the Marina
Power Dock at desired location as shown in
Fig.1.  (Note Fig. 1 represents underside of
work surface). 

2-

Mark or pilot drill the location for center
mounting screws as shown in Fig.1. *

Marina Power Dock Installation: 

1-

Install 1 - #10 pan head screw (not provided) into center mounting screw position on underside of work
surface, see Fig.1.  Do not fully tighten screw at this point.

2-

Insert middle flange slot of one end of the Marina onto mounting screw to support the Marina while
installing 2

nd

 - #10 pan head screw (not provided) align with the other center mounting screw position.  Do

not fully tighten screws at this point.

3-

Center the Marina in the cutout and secure to underside of surface using remaining holes in side flanges.**

4-

Tighten center screws from step 1 and 2 above.

Tools Needed 

Components & Hardware

   

Marina Grommet

Fig. 1

Отзывы: