IMD 100 Integration manual 4189360015 Rev. G
Operational procedures
Page 129 of 243
9.
Operational procedures
This section describes operational procedures which can be executed either by using the IMD
Manager or the CAN/CANopen interface.
9.1
Brake test
It is possible to manually test the brake output in order to verify that the brake is released and the
motor can turn. Activating the brake test is done by using function 08 in the special commands.
9.1.1 Prerequisites
The IMD must be in Normal operation state, and the Device must be disabled (reg. 0x51 bit 2 = 1).
9.1.2 Activation
IMD Manager:
Select “8:Brake test” in the “States and special commands” in the “Monitor and control”
tab.
CAN/CANopen:
send “
8
” to the special commands register (reg. 0x03)
The IMD changes state to 40
– “Brake test”, turns the brake output (X2) on, and changes the “Brake
output” LED indication in the IMD Manager to on.
9.1.3 Operation
The IMD will remain in this state until “
0
” (Idle) is sent to special commands register (reg. 0x03).
It is not possible to use the “Enable dev.” button or enable the device through CAN while the IMD is in
brake test.
9.1.4 Deactivation
IMD Manager:
Select “0:Idle” in the “States and special commands” in the “Monitor and control” tab.
CAN/CANopen:
send “
0
” to the special commands register (reg. 0x03).