24.03.2017
ASSEMBLY AND OPERATING MANUAL DEGERtracker D60H, D80, D100
Page 29
6.12
Overview of cable routing through the gearbox cover plate
ATTENTION!
When routing cables between rotating head and base frame, ensure sufficient clearance, so that
these will not be squashed or strained during operation!
ATTENTION!
Local regulations and instructions of any third party components (e.g. inverter or modules) have to
be followed and additional measures should be taken if necessary!
Routing of cables
1.
If necessary, replace the plugs with the supplied, perforated
inserts.
2.
Route all cables downwards through the mast and through
the bore (Ø 50 mm) at half-mast height to the outside.
3.
Loosely fasten all cables with a cable strap at both bores.
4.
Fasten the front gearbox cover again with the two bolts
M8x12 and one washer each.
Tightening torque: 24 Nm
Wind sensor
Snow sensor
Communication EC-6 - CCB
Free for 2 string cable
AC-supply EC-6
Free for AC-line if inverter on rotating head
or
6 string cable for external inverter
Free for communication line if
inverter on rotating head
Free for communication line if
inverter on rotating head
Free for 2 string cable