
5 Before installation
5.1
Installation regulations
Warning
The boiler must be installed by a qualified installer in accordance
with local and national regulations.
5.2
Choice of the location
5.2.1
Data plate
The identification plate is located behind the boiler casing on the frame,
near the syphon connection. The data plate provides important information
on the boiler specifications such as the model and the device category.
5.2.2
Installing the boiler C 330 ECO
Use the guidelines and the required installation space as a basis for
determining the correct place to install the boiler.
When determining the correct installation area, take account of the
permitted position of the flue gas outlet and/or air supply outlet.
Ensure that there is sufficient space around the boiler for good access
and ease of maintenance.
A technical clearance of at least 80 cm is required at the front (service
side) of the boiler. However, we recommend that the clearance is at
least 100 cm. Above the boiler, we recommend a clearance of at least
40 cm (when using an air inlet filter, the clearance must be at least 65
cm). A minimum of 30 cm is required on the side of the flue gas outlet,
and a minimum of 30 cm is also required on the other side (or 80 cm, if
this is operating side).
Fig.6
Position of data plate
AD-0000487-01
5 Before installation
7600532 - v.11 - 13122018
23
Содержание C 330 ECO
Страница 90: ...14 Appendix 90 7600532 v 11 13122018...