![ddtop GLCG Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/ddtop/glcg/glcg_operation-manual_2460701009.webp)
9
/
10
WWW.DDTOP.COM
5.2 Check the contents
5.2.1 Check the appearance of the meter for defects, damage, etc.
6 Installation
6.1 Installation tools
6.1.1 Wrenches, welding machines, etc. for process connections
6.2 Methods of use and operating procedures - Figure 4
空
气
水
出
口
接
空
气
系
统
快
换
接
头
1
2
3
4
5
6
7
8
9
1
0
图 4
1. After the installation of the equipment, the first thing is to check the equipment thoroughly and
carefully. The liquid storage tank and pipeline should be purged and cleaned to prevent debris from
entering the pipeline system.
2. When filling the isolation fluid, connect the No. 10 isolation fluid tank with quick-change
couplings as shown in Figure 4. Close valve 2 and slowly open valve 1. Slowly press the antifreeze
solution into the reservoir with compressed air and close valve 1 when the demand is reached.
3. Close valve 4 and open valve 3. Fill the tank proportionally with fresh water and open valve 2. Stir
the solution with compressed air, and close valve 3.