background image

     

 

 

10

 / 

10

 

 

WWW.DDTOP.COM 

4. Once the above is completed, the outlet pressure adjustment can be made. First, close the valve 5, 
and open the valve 7, start the metering pump. After the metering pump runs normally, adjust the 
pressure  regulator  6  until it  is  adjusted  to  the  required  pressure.  At  this  point you  can  open  the 
valve 5 on the system for filling. 
 
5. During the summer months, valves 3 and 5 can be closed and valve 4 opened to directly fill the 
system with fresh water, depending on the conditions. 

7 Disassembly       

7.1 Warnings 

Before  disassembly,  attention  should  be  paid  to  hazardous  process  conditions,  such  as  excessive 
pressure in the piping. 

7.2 Waste removal 

Please follow the existing guidelines for waste disposal in your region. 

Содержание GLCG

Страница 1: ...1 10 WWW DDTOP COM GLCG BUFFER BARRIER FLUID SYSTEM Operation Manual GLCG DT JS 1034 2019 A...

Страница 2: ...nge without notice Dandong Top Electronics Instrument Group Co Ltd reserves the right to modify the products described in this manual at any time without notice Quality Assurance Dandong Top Electroni...

Страница 3: ...rument Group Co Ltd has passed the ISO9001 quality system certification The whole production process is carried out in strict accordance with the provisions of the quality system to provide the strong...

Страница 4: ...ct structure Figure 1 5 2 2 Operating Principle 6 2 3 Packaging 6 2 4 Lifting for transport 6 2 5 Storage 6 3 2 Main Technical parameters 7 4 Outline drawing 7 Figure 2 Outline drawing 8 5 Unpacking a...

Страница 5: ...national standards codes and procedures Ensure that equipment is installed in accordance with intrinsically safe or non flammable site work procedures 1 2 Serious injury or death may result from proce...

Страница 6: ...upporting 8 Glass tube level meter displaying the height of the isolated liquid level in the tank 9 Liquid storage tanks storage of isolation fluids 2 2 Operating Principle Buffer Barrier Fluid System...

Страница 7: ...a 0 16MPa Outlet Flow Rate 125L h 160L h 200L h Tank Capacity 1 1 m3 Motor Power 2 2kW 4kW Power Supply 380VAC 50Hz System Material 304 4 Outline drawing GLCG 200 16 GLCG 200 16 200L h 200L h 0 16MPa...

Страница 8: ...ecking 5 1 Precautions for unpacking inspection 5 1 1 Check whether the Product Name Plate Figure 3 is consistent with the information in the supply list Figure 3 Product Name Plate 5 1 2 Check whethe...

Страница 9: ...ghly and carefully The liquid storage tank and pipeline should be purged and cleaned to prevent debris from entering the pipeline system 2 When filling the isolation fluid connect the No 10 isolation...

Страница 10: ...quired pressure At this point you can open the valve 5 on the system for filling 5 During the summer months valves 3 and 5 can be closed and valve 4 opened to directly fill the system with fresh water...

Отзывы:

Похожие инструкции для GLCG