DAVIS WYNYRD Series Скачать руководство пользователя страница 1

 

Installation Instruction

 

 

 

 
                                   

 

 

WYNYRD SERIES 

 

 

 

 

 

 

 

  

 

STORAGE: 

 Prior to installation products are to be stored in cool and dry conditions. 

 

APPLICATION:  

The

 

installation application and orientation of the product is designed in accordance with the nominated product IP rating, class 

designation. Installation environments outside these conditions are not recommended. The product is designed to be installed 

in the horizontal orientation only.

 

                  

INSTALLATION: 

 

1.

 

Dismantle diffuser from the body and remove LED module tray inside. 

 

 

 

 

2.

 

Install and screw ceiling mount brackets to the body. 

 

 

 

3.

 

Replace plug with cable gland. 

 

 

 

 

Read all instructions to prevent injury, electric shock or damage due to fire & mechanical hazard 

 

See product label for supply specifications 

 

Отзывы: