Controls after first installation
The control operations to carry-out after the first installation and before machine start-
up are listed hereinafter. The controls must be carried-out by qualified personnel, either
directly or under the strict supervision of the person in charge of machinery Safety.
Check that:
• The ESPE remains in Safe State intercepting the beams along the detection zone
using the specific test piece (TC-14, TP-30), following the scheme shown in Figure
Figure 16: Path of the test piece
• ESPE has to be correctly aligned: press slightly on the product side in both direc
-
tions, the red LED must not turn on.
• The activation on the TEST function (on TX side) causes the opening of the OSSD
outputs (red LED, OSSD on RX side, ON and controlled machine stop).
• The response time at machine STOP, including the ESPE and machine response
times, must be included in the limits defined in the calculation of the safety dis
-
tance (refer to “
Minimum installation distance, starting on page 10
).
• The safety distance between the dangerous parts and ESPE must comply with the
requirements indicated in
Minimum installation distance, starting on page 10
.
• A person must not access or remain between ESPE and the dangerous parts of the
machine.
• Access to the dangerous areas of the machine must not be possible from any
unprotected area.
• ESPE must not be disturbed by external light sources, ensure that it remains in
Normal Operation for at least 10-15 minutes, and placing the specific test piece in
the protected area, in the Safe State for the same period.
• Verify the correspondence of all the accessory functions, activating them in the
different operating conditions.
GO
END
Содержание SH4 BASE-STANDARD
Страница 1: ...SH4 BASE STANDARD PRODUCT REFERENCE GUIDE Safety Light Curtains...
Страница 6: ...CONTENTS vi SH4 BASE STANDARD...
Страница 13: ...COMPLIANCE PRODUCT REFERENCE GUIDE 5...
Страница 29: ...GENERAL INFORMATION ON DEVICE POSITIONING PRODUCT REFERENCE GUIDE 21...
Страница 33: ...PRODUCT REFERENCE GUIDE 25...
Страница 38: ...ELECTRICAL CONNECTIONS 30 SH4 BASE STANDARD...
Страница 59: ...SH4 X XXXX X X MODELS PRODUCT REFERENCE GUIDE 51...
Страница 65: ...PRODUCT REFERENCE GUIDE 57...
Страница 69: ...RESPONSE TIMES PRODUCT REFERENCE GUIDE 61...
Страница 73: ...SH4 2 3 4 XXXX X X PRODUCT REFERENCE GUIDE 65...
Страница 75: ...METAL ANGLED FIXING BRACKET PRODUCT REFERENCE GUIDE 67...
Страница 99: ...RECOVERY TIME PRODUCT REFERENCE GUIDE 91...