CONTROL RACK INSTALLATION
USER MANUAL
13
CONTROL RACK INSTALLATION
Horizontal installation
The control rack must be positioned in a safe manner, following the recommendations
below:
Figure 2: Control rack horizontal positioning
The control rack can be installed on a standard 19" rack cabinet using the fixing brackets
supplied as a standard equipment with XXX-X6X models and as an accessory for XXX-X5X
models (see "
).
The figure below shows the fixing points for installation in a rack cabinet. Rack handles
for an easier installation are available as an accessory (see "
).
Using the fixing brackets is possible to install the control rack in three different positions
inside the cabinet:
NOTE
Figure 3: Control rack fixing bracket mounting configuration
All dimensions are in millimeters.
Содержание Arex 400
Страница 1: ...AREX 400 USER MANUAL InfraRed Fiber Laser Marker ...
Страница 64: ...NOTE SET UP 56 AREX 400 Figure 7 Connecting the monitor Minimum monitor resolution 800 x 600 VGA standard ...
Страница 145: ...USER MANUAL 137 APPENDIX H MECHANICAL DRAWINGS ...
Страница 146: ...MECHANICAL DRAWINGS 138 AREX 400 CONTROL RACK NOTE Please refer to Datalogic website for detailed drawings ...
Страница 147: ...SCAN HEAD USER MANUAL 139 SCAN HEAD NOTE Please refer to Datalogic website for detailed drawings ...