14
•
Equipment Controls and Indicators
Ahiba IR User's Guide
Beaker Preparation, Cleaning and Maintenance
Beaker Installation
The beaker wheel is fitted with a simple mechanical latching system to lock the
beakers in place on the wheel. Beaker installation includes the following steps:
•
Secure beaker lids. This is done each time a dyeing process is run.
•
Install beakers
•
Install/connect reference beaker
All of the steps described below must be performed for each dyeing cycle.
Securing the Beaker Lids
Before the beakers are attached to the wheel, the lids must be secured using the
hex screwdriver supplied with the unit. To secure the lids:
1.
Ensure beaker lid and beaker flange are a smooth and even seal.
Содержание AHIBA IR
Страница 2: ......
Страница 4: ......
Страница 26: ...20 Equipment Controls and Indicators Ahiba IR User s Guide N O T E S ...
Страница 34: ...28 Program Controls Ahiba IR User s Guide N O T E S ...
Страница 50: ...44 Appendix Ahiba IR User s Guide N O T ES ...