2.1 Pre-Installation Responsibilities and component packing list
This document is a guide to the steps that need to be performed to correctly install
the X700 Examination light. However, the work required to be performed is the
responsibility of the owner or designated contractor/s.
All fixings between DARAY lights and the building super-structure must be approved
by either the chief project engineer or an appropriate and competent structural
assessor.
The components supplied by DARAY for fitting / installation should be the following
items in the specified quantities.
X700LD/FDM/S
Qty.
X700LW
Qty.
12V Plug top transformer (1.8m)
1
12V Plug top transformer (1.8m)
1
Desk Clamp/Fixed Desk Mount/Desk
Stand
1
Wall b fixings
1
Light head and flexible arm
1
Thumb Screw for Wall Mount
1
Microfibre cloth
1
Light head and flexible arm
1
User Manual
1
Microfibre cloth
1
User Manual
1
X700LR
Qty.
X700LM
Qty.
12V Plug top transformer (1.8m)
1
IEC Cable (3m)
1
Rail Clamp
1
12V PSU + bracket kit
1
Thumb Screw for Rail Clamp
1
Mobile base (2 pieces)
1
Light head and flexible arm
1
Light head and flexible arm
1
Microfibre cloth
1
Microfibre cloth
1
User Manual
1
User Manual
1
2.2 Pre-Start Checks
Please check that the power cable is without visible damage, harsh folds, knots or
cuts in the rubberised coating.
When applicable, please check that the cable is fully inserted into the power socket,
before switching the power on.
Please check that the head and all parts of the base are without visible damage.
Содержание X700
Страница 1: ...X700 LED Examination Light Operating Installation Manual QAM X700 0519 4...
Страница 2: ...Page 1 of 24...
Страница 9: ...Page 8 of 24...
Страница 25: ...Page 24 of 24 Service Notes...
Страница 26: ...Page 25 of 24...
Страница 27: ...Page 26 of 24...