D2-10 Series Two-Post Lifts
13
P/N 5900249 — Rev. B — February 2021
Installation Checklist
Following are the steps needed to install a D2-10 Series Lift; perform them in this order.
☐
1. Review the Safety Rules.
☐
2. Plan for Electrical work.
☐
3. Make sure you have the necessary Tools.
☐
4. Review the Installation Orientation.
☐
5. Review Clearances around the Lift.
☐
6. Select the Installation Location.
☐
7. Put Equalizing Cables into position in the Lift Posts.
☐
8. Read about Hydraulic Fluid contamination.
☐
9. Put Hydraulic Hoses into position in the Lift Posts.
☐
10. Create Chalk Line Guides for the Posts.
☐
11 Install the Posts.
☐
12. Prepare and install the Overhead Assembly, Safety Shutoff Bar, and the Microswitch.
☐
13. Route the Safety Lock Cable.
☐
14. Install the Equalizing Cables.
☐
15. Mount the Power Unit on the Lift Post (
do not connect it yet
).
☐
16. Install the Safety Assemblies and the Safety Lock Cable.
☐
17. Connect the Hydraulic Hoses.
☐
18. Learn about Arm Restraint Gears.
☐
19. Install the Lift Arms.
☐
20. Perform final Leveling.
☐
21. Contact the Electrician.
☐
22. Wire the Microswitch (
requires an Electrician
).
☐
23. Connect the Power Unit (
requires an Electrician
).
☐
24. Install the Power Disconnect Switch (
requires an Electrician
).
☐
25. Install the Thermal Disconnect Switch (
requires an Electrician
).
☐
26. Install the Safety Covers.
☐
27. Lubricate the Lift.
☐
28. Perform an Operational Test.
☐
29. Review the final Checklist.
Содержание D2-10 Series
Страница 11: ...D2 10 Series Two Post Lifts 11 P N 5900249 Rev B February 2021 D2 10A Specifications ...
Страница 12: ...D2 10 Series Two Post Lifts 12 P N 5900249 Rev B February 2021 D2 10C Specifications ...
Страница 72: ...D2 10 Series Two Post Lifts 72 P N 5900249 Rev B February 2021 Labels ...
Страница 73: ...D2 10 Series Two Post Lifts 73 P N 5900249 Rev B February 2021 ...
Страница 74: ...D2 10 Series Two Post Lifts 74 P N 5900249 Rev B February 2021 ...
Страница 75: ...D2 10 Series Two Post Lifts 75 P N 5900249 Rev B February 2021 ...
Страница 76: ...D2 10 Series Two Post Lifts 76 P N 5900249 Rev B February 2021 Parts Drawings ...
Страница 77: ...D2 10 Series Two Post Lifts 77 P N 5900249 Rev B February 2021 ...
Страница 78: ...D2 10 Series Two Post Lifts 78 P N 5900249 Rev B February 2021 ...
Страница 79: ...D2 10 Series Two Post Lifts 79 P N 5900249 Rev B February 2021 ...
Страница 80: ...D2 10 Series Two Post Lifts 80 P N 5900249 Rev B February 2021 ...
Страница 81: ...D2 10 Series Two Post Lifts 81 P N 5900249 Rev B February 2021 ...
Страница 82: ...D2 10 Series Two Post Lifts 82 P N 5900249 Rev B February 2021 ...
Страница 84: ...D2 10 Series Two Post Lifts 84 P N 5900249 Rev B February 2021 Maintenance Log ...
Страница 85: ...D2 10 Series Two Post Lifts 85 P N 5900249 Rev B February 2021 Maintenance Log ...
Страница 86: ...D2 10 Series Two Post Lifts 86 P N 5900249 Rev B February 2021 Maintenance Log ...
Страница 87: ...D2 10 Series Two Post Lifts 87 P N 5900249 Rev B February 2021 Maintenance Log ...
Страница 88: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2021 by BendPak Inc All rights reserved dannmar com ...