The IP address assignment is also required when using indirect communication via the VLT
®
Servo Toolbox software (see the VLT
®
Servo Drive System ISD 510, DSD 510, MSD 510 Programming Guide for further information).
The IP address and the device name can also be assigned using PRONETA, a free tool that supports in the analysis and configuration of
PROFINET
®
networks.
6.7 Power-Up Time
The maximum power-up time for the system components is 15 s. This means the time from supplying the system with auxiliary voltage
to the module being initialized completely.
The power-up time stated is an indicative time. The exact status of the module can be seen via the statusword.
NOTICE
-
Do not operate any of the system modules until they are all powered up correctly.
-
If 2 PSM 510 modules are mounted in parallel, power up both PSM 510 modules simultaneously (within a maximum delay
of 1 second).
6.8 System Module Charging Time
The charging time of the system is determined by the longest charging time of each individual system module.
The exact status of each module can be seen via the statusword.
NOTICE
-
Do not operate any of the system modules until they are charged up completely and are in state
Operation enabled
.
Table 16: DC-Link (UDC) Charging Time for PSM 510, DAM 510, and ACM 510
Specification
Unit
PSM 510
DAM 510
ACM 510
UDC charging time
s
2.0
2.0
3.5
Table 17: DC-Link (UDC) Charging Time for SDM 511
Specification
Unit
SDM 511
2.5 A
SDM 511
5 A
SDM 511
10 A
SDM 511
20 A
UDC charging time
s
2.0
Commissioning
Operating Guide | VLT® Multiaxis Servo Drive MSD 510 System
AQ262450196490en-000101 / 175R1170| 85
Danfoss A/S © 2019.10
Содержание VLT MSD 510
Страница 1: ...Operating Guide VLT Multiaxis Servo Drive MSD 510 System...
Страница 2: ......