Rigging/derigging
WARNING!
Potential risk of personal injury and/or
damage to material!
Always secure ground stacked setups against movement and
possible tipping over.
Observe the maximum number of cabinets permitted. This is
particularly important when setting up mixed ground stacks.
3.1 Preparing the setup
General
Check the acoustical and mechanical setup using ArrayCalc.
When on site first:
▪ Clear the working areas and ensure there is enough space to
set up the ground stack.
▪ Prepare the cables and link cables according to the number of
amplifier channels and cabinets used.
Inspections before setup
Before setting up the ground stack, carry out a visual inspection of
all system components for faults. This also includes the
loudspeakers and in particular the rigging parts of the cabinets
(Front and Splay/Rear links).
Damaged components must be withdrawn from use immediately.
Please also follow the instructions given in
3.2 Order of assembly
3.2.1 AL ground stack
1. Prepare the Base plate
1. Fix the Splay link of the Base plate in the required hole
position.
2. Position the Base plate on the ground.
3 Rigging/derigging
d&b Z5458
AL Base plate Rigging manual 1.1 en
10