![dallmeier IPS 10 000 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/dallmeier/ips-10-000/ips-10-000_manual_3312186016.webp)
IPS 10 000
16
www.dallmeier.com
6 Requirements
The device is designed for mounting and operation in a 19'' standard rack
with active ventilation. The required rails are included in the scope of
delivery.
Rack Installation
➡
Ensure a free space of at least 60 cm at the front of the rack in order
to be able to fully open the door.
➡
Ensure a free space of at least 75 cm at the rear of the rack in order to
enable sufficient air circulation and access for maintenance.
➡
Install the rack at a place with limited access (device or server room).
➡
Ensure that the rack is installed in a stable way and is suitable to with
-
stand the weight of the mounted devices.
Device Installation
➡
Install heavy devices at the bottom of the rack.
➡
Note that the temperature in the top of the rack can be higher than
at the bottom.
➡
Plan a distance between the devices in order to allow a better air
circulation.
➡
Ensure a sufficient air circulation by a free space of 10 cm at the front
and rear side of the device.
Operation in the Rack
➡
Keep the doors of the rack closed in order to ensure a sufficient air
circulation.
Secure Earthing
➡
Ensure anytime a proper grounding, preferably through a direct
grounding of the rack.
Содержание IPS 10 000
Страница 1: ...005843 1 0 3 2018 12 19 IPS 10 000 Commissioning English...
Страница 3: ...6 32 1 2 2 2...
Страница 4: ......
Страница 35: ...IPS 10 000 www dallmeier com 35 Notes...